Within 28 days from the receipt <strong>of</strong> a written request from the Local Planning<br />

Authority and following a complaint to the Local Planning Authority from the<br />

occupant <strong>of</strong> a dwelling which lawfully exists or has planning permission at the<br />

date <strong>of</strong> this consent, the applicant shall, at the applicant’s expense, employ an<br />

independent consultant approved by the Local Planning Authority to assess the<br />

level <strong>of</strong> noise from the Willow’s Power and recycling centre, Kings <strong>Lynn</strong> at the<br />

complainant’s property. The methodology must be agreed by the Local Planning<br />

Authority.<br />

The applicant shall provide to the Local Planning Authority the independent<br />

consultant’s assessment and conclusions regarding the said noise complaint,<br />

including all calculations, audio recordings and the raw data upon which those<br />

assessments and conclusions are based. Such information shall be provided<br />

within 3 months <strong>of</strong> the date <strong>of</strong> the written request <strong>of</strong> the Local Planning Authority<br />

unless otherwise extended in writing by the Local Planning Authority.<br />

No development shall commence until there has been submitted to the Local<br />

Planning Authority details <strong>of</strong> a nominated representative for the development to<br />

act as a point <strong>of</strong> contact for local residents (in connection with above conditions)<br />

together with the arrangements for notifying and approving any subsequent<br />

change in the nominated representative. The nominated representative shall<br />

have responsibility for liaison with the Local Planning Authority in connection with<br />

any noise complaints made during the construction, operation and<br />

decommissioning <strong>of</strong> the wind farm.<br />

No development shall commence on site until a management plan to protect the<br />

local residents from dust and odour has been submitted to and approved in<br />

writing by the Local Planning Authority. The scheme shall be implemented as<br />

approved before the development is brought into use.<br />

Dust and Odour<br />

In relation to the potential for disamenity due to dust, Chapter 7 <strong>of</strong> the Environmental<br />

Statement re iterates a quote from MPS2 Annex 1: that dust can affect residents up to 1km<br />

from the source. There are residential dwellings within this radius <strong>of</strong> the development site<br />

and therefore an assessment and identification <strong>of</strong> controls is necessary.<br />

The collection and storage <strong>of</strong> waste has the potential to be a great source <strong>of</strong> odour, and<br />

there will be a number <strong>of</strong> sources on site that need to be adequately controlled in order to<br />

prevent disturbance/ disamenity to the closest residents through odour. For these reasons I<br />

request that the following condition is imposed upon any consent granted.<br />

No development shall commence on site until a management plan to protect the<br />

local residents from dust and odour has been submitted to and approved in<br />

writing by the Local Planning Authority. The scheme shall be implemented as<br />

approved before the development is brought into use.<br />

Prior to commencement <strong>of</strong> construction work the applicants are to fund and<br />

provide for the monitoring <strong>of</strong> dust, in the form <strong>of</strong> PM10. The monitoring locations<br />

and methodology is to be submitted to and approved in writing by the Planning<br />

Authority prior to commencement. The monitoring shall be carried out as<br />

approved.<br />

<strong>11</strong>/01064/CM Development Control Board<br />

25 July 20<strong>11</strong><br />

13