11/00713/F - Borough Council of King's Lynn & West Norfolk
11/00713/F - Borough Council of King's Lynn & West Norfolk
11/00713/F - Borough Council of King's Lynn & West Norfolk
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
6 Reason To ensure the permanent availability <strong>of</strong> the parking and manoeuvring area, in<br />
the interests <strong>of</strong> highway safety.<br />
7 Condition Prior to the commencement <strong>of</strong> development the applicant shall submit a<br />
scheme showing the position and design <strong>of</strong> the installation <strong>of</strong> bat boxes The agreed<br />
boxes shall be installed prior to commencement <strong>of</strong> any works <strong>of</strong> construction or<br />
demolition.<br />
7 Reason In the interests <strong>of</strong> the protection <strong>of</strong> bats.<br />
8 Condition The mitigation measures relating to the timing <strong>of</strong> the works and the checking<br />
<strong>of</strong> cavities which may affect bats, referred to in the Summary (paragraphs 9.1 – 9.4<br />
inclusive) <strong>of</strong> the Updated Protected Species Survey by Philip Parker Associates, dated<br />
19 November 2010 shall be implemented as recommended.<br />
8 Reason To safeguard the interests <strong>of</strong> a protected species in accordance with Planning<br />
Policy Statement 9, Policy ENV3 <strong>of</strong> the East <strong>of</strong> England Plan 2008 and Policy CS12 <strong>of</strong><br />
the <strong>King's</strong> <strong>Lynn</strong> and <strong>West</strong> <strong>Norfolk</strong> Core Strategy.<br />
9 Condition No development shall commence until full details <strong>of</strong> the foul water drainage<br />
arrangements for the site have been submitted to and approved in writing by the Local<br />
Planning Authority. The drainage details shall be constructed as approved before any<br />
part <strong>of</strong> the development hereby permitted is brought into use.<br />
9 Reason To ensure that there is a satisfactory means <strong>of</strong> drainage serving the site.<br />
10 Condition Prior to the commencement <strong>of</strong> the development, an investigation and risk<br />
assessment, in addition to any assessment provided with the planning application,<br />
must be completed in accordance with a scheme to assess the nature and extent <strong>of</strong><br />
any contamination on the site, whether or not it originates on the site. The contents <strong>of</strong><br />
the scheme are subject to the approval in writing <strong>of</strong> the Local Planning Authority. The<br />
investigation and risk assessment must be undertaken by competent persons and a<br />
written report <strong>of</strong> the findings must be produced. The written report is subject to the<br />
approval in writing <strong>of</strong> the Local Planning Authority. The report <strong>of</strong> the findings must<br />
include:<br />
(i) a survey <strong>of</strong> the extent, scale and nature <strong>of</strong> contamination;<br />
(ii) an assessment <strong>of</strong> the potential risks to:<br />
� human health,<br />
� property (existing or proposed) including buildings, crops, livestock,<br />
pets,<br />
woodland and service lines and pipes,<br />
� adjoining land,<br />
� groundwaters and surface waters,<br />
� ecological systems,<br />
� archaeological sites and ancient monuments;<br />
(iii) an appraisal <strong>of</strong> remedial options, and proposal <strong>of</strong> the preferred option(s).<br />
This must be conducted in accordance with DEFRA and the Environment Agency’s<br />
‘Model Procedures for the Management <strong>of</strong> Land Contamination, CLR <strong>11</strong>’.<br />
<strong>11</strong>/00881/F Development Control Board<br />
25 July 20<strong>11</strong><br />
148