It has been recognised by the Planning Inspectorate at appeal that a suitably worded<br />

condition requiring the fitting <strong>of</strong> sensors and the shutting down <strong>of</strong> the turbines should icing<br />

occur is a satisfactory way <strong>of</strong> overcoming this issue and preventing potential harm.<br />

TRAFFIC AND HIGHWAY ISSUES<br />

The abnormal load vehicles would travel south on the A47 towards King’s <strong>Lynn</strong>. The route<br />

would take the A148 east, then north on the B1454 and Barwick Road to site. Widening<br />

works would be required at the junction <strong>of</strong> the A148 and B1454, and along Barwick Road to<br />

the site. Increased traffic levels would only be experienced during the 12 months <strong>of</strong><br />

construction. Traffic management measures would be implemented prior to, and during, the<br />

construction phase in consultation with the relevant Highways Authorities and the Police to<br />

ensure road safety. It is concluded by the agent that the local transport network would be<br />

able to absorb the additional traffic movements associated with the construction <strong>of</strong> the wind<br />

farm and that there would not be significant effect <strong>of</strong> disturbance on local residents and other<br />

roads users. The cumulative transport effects <strong>of</strong> the Jack’s Lane wind farm and the Chiplow<br />

wind farm have been assessed and are unlikely to have significant effects.<br />

Unlike most other developments, the main impact on highways associated with this<br />

development is during construction and decommissioning. The impact on traffic flows during<br />

construction including the abnormal loads would be noticeable to residents and road users.<br />

The disruption would be limited to a relatively short period <strong>of</strong> time, given the operational<br />

lifetime <strong>of</strong> the development.<br />

<strong>Norfolk</strong> County <strong>Council</strong>, Highways have confirmed that no highway improvements are<br />

needed to cater for abnormal load deliveries with the exception at the junction between the<br />

A148/B1454 at Tattersett and along from Hyde Park and improvements to Burnham Road<br />

which involve the widening to accommodate the traffic associated with the project. The<br />

Highways Authority has raised no objection to the proposal subject to condition.<br />

FOOTPATHS AND BRIDLEWAYS<br />

There is no statutory separation distance between a wind turbine and a public right <strong>of</strong> way.<br />

However, the minimum desirable distance between wind turbines and occupied buildings<br />

calculated on the basis <strong>of</strong> expected noise levels and visual impact will <strong>of</strong>ten be greater than<br />

that necessary to meet safety requirements. Fall over distance (i.e. the height <strong>of</strong> the turbine<br />

to the tip <strong>of</strong> the blade) plus 10% is <strong>of</strong>ten used as a safe separation distance (para 51<br />

Planning for Renewable Energy A Companion Guide to PPS22). Should a micro-siting<br />

condition be attached this could be achieved. Alternatively a condition could be attached<br />

stating that no turbine tower shall be sited with a specific distance <strong>of</strong> the public right <strong>of</strong> way.<br />

SOCIO-ECONOMIC ISSUES<br />

According to the applicant, the proposal represents a significant capital investment in the<br />

area <strong>of</strong> £19 million (approximately) by RES. During the 12 month construction phase it is<br />

estimated that up to 40 short term jobs will be created. It is estimated that 80% <strong>of</strong> these<br />

construction jobs would be sourced locally. Construction could impact on the local supply<br />

chain as businesses may have the opportunity to provide goods and services.<br />

10/01419/FM Development Control Board<br />

25 July 20<strong>11</strong><br />

63