8 Reason To ensure that the flood plain is free from development in order to alleviate the<br />
increased risk <strong>of</strong> flooding that would otherwise be caused as a result <strong>of</strong> a reduction in<br />
flood storage capacity, in accordance with PPS25.<br />
9 Condition The golf clubhouse, leisure club and spa building and blocks D, E and F<br />
shall be completed in accordance with the materials submitted to discharge condition<br />
12 attached to consent reference 07/00437/FM.<br />
9 Reason To ensure a satisfactory external appearance and grouping <strong>of</strong> materials in<br />
accordance with PPS1 and PPS5.<br />
10 Condition The details <strong>of</strong> the door and window style, reveal, cill and header treatment<br />
for the golf clubhouse, leisure centre and spa building and blocks D, E and F shall<br />
accord with the details submitted to discharge condition 13 attached to planning<br />
permission reference 07/00437/FM.<br />
10 Reason To ensure that the design and appearance <strong>of</strong> the development is appropriate<br />
in accordance with PPS1 and PPS5.<br />
<strong>11</strong> Condition The boundary treatments shown on plan 0355-MF1 Rev B shall, with the<br />
exception <strong>of</strong> that to the south <strong>of</strong> the site, be completed prior to the first occupation <strong>of</strong><br />
either the golf clubhouse, leisure centre and spa building or block D, E and F. The<br />
hedge and tree planting shown on the southern site boundary shall be planted within 6<br />
months <strong>of</strong> the date <strong>of</strong> this consent or such other timescale as may be agreed in writing<br />
by the Local Planning Authority within the same timescale.<br />
<strong>11</strong> Reason To ensure that the development is compatible with the amenities <strong>of</strong> the locality<br />
in accordance with PPS1.<br />
12 Condition The planting scheme shown on drawing 0355-3 Rev B, submitted to<br />
discharge condition 16 <strong>of</strong> consent reference 07/00437/FM in relation to the golf course<br />
and implemented on site, shall be maintained for a period <strong>of</strong> 5 years from the date <strong>of</strong><br />
this consent. Any trees or plants that within the maintenance period die, are removed<br />
or become seriously damaged or diseased, shall be replaced in the next planting<br />
season with others <strong>of</strong> similar size and species as those originally planted, unless the<br />
Local Planning Authority gives written approval to any variation.<br />
12 Reason To ensure that the work is carried out within a reasonable period in<br />
accordance with PPS1.<br />
13 Condition Those parts <strong>of</strong> the landscape scheme shown on drawing 0335-MF1 Rev B<br />
that relate to the hotel and units A, B and C submitted to discharge condition 16<br />
attached to consent 07/00437/FM and implemented on site shall be maintained for a<br />
period <strong>of</strong> 5 years from the date <strong>of</strong> this consent. Any trees or plants that within the<br />
maintenance period die, are removed or become seriously damaged or diseased, shall<br />
be replaced in the next planting season with others <strong>of</strong> similar size and species as those<br />
originally planted, unless the Local Planning Authority gives written approval to any<br />
variation.<br />
13 Reason To ensure that the work is carried out within a reasonable period in<br />
accordance with PPS1.<br />
<strong>11</strong>/00302/F Development Control Board<br />
25 July 20<strong>11</strong><br />
108