05.02.2013 Views

View - North East Lincolnshire Council

View - North East Lincolnshire Council

View - North East Lincolnshire Council

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

BOC Immingham Dissolved Acetylene Project Environmental Statement: Vol. 2 Main Text<br />

List of Figures<br />

Figure 1.1 Location of the Proposed Development 2<br />

Figure 1.2 Location Plan 2<br />

Figure 3.1 Piling Locations 18<br />

Figure 3.2 Overall Site Layout 26<br />

Figure 3.3 Main Site Process Area Layout 27<br />

Figure 3.4 Preliminary Landscape Plan 39<br />

Figure 6.1 Wind Rose Diagram for Donna Nook, 2005 to 2009 80<br />

Figure 7.1 ESG 2011 GI: Location of BHs, TPs and WSs 93<br />

Figure 8.1 Water Quality Sampling Locations 113<br />

Figure 8.2 Location of Main Drains in the Vicinity of the Development Site 116<br />

Figure 9.1 Flood Map (derived from Environment Agency Website 2010) 132<br />

Figure 9.2 Photographs of Middle Drain and the Pumping Station 134<br />

Figure 9.3 Coastal Defence 135<br />

Figure 9.4 Humber Standard of Protection 136<br />

Figure 9.5 Flood Warning Area (EA 2011) 138<br />

Figure 10.1 Phase 1 Habitat Map 156<br />

Figure 10.2 Designated Sites within 2 km of the Development Area 157<br />

Figure 11.1 Noise Survey Measurement Positions 195<br />

Figure 12.1 Road Network in Vicinity of Development Site 214<br />

Figure 13.1 Photograph Taken from Hobson Way, Looking Towards the Current BOC Site 233<br />

Figure 13.2 Photograph Taken from <strong>North</strong> Moss Lane Looking Towards the Site 234<br />

Figure 13.3 Photograph Illustrating Prominent Industrial Features of the Landscape 235<br />

Figure 13.4 Night Time <strong>View</strong> Looking Down Hobson Way Toward the Existing BOC Site 235<br />

Figure 13.5 Photograph Taken from the Flood Defence Embankment (West of the Site) 236<br />

Figure 13.6 Photograph from South Moss Lane 238<br />

Figure 13.7 <strong>View</strong> of Pylons and the Power Station off Hobson Way 238<br />

Figure 13.8 Tipping Activities to the <strong>North</strong> of Kings Road 239<br />

Figure 13.9 <strong>View</strong> over the Estuary from PRoW along the Flood Defence Embankment 240<br />

Figure 13.10 Photograph from Junction of Hobson Way and South Marsh Lane, Looking Towards the<br />

Existing BOC Site. 240<br />

Figure 13.11 Characteristic <strong>View</strong>s of Estuarine Industrial Development 241<br />

Figure 14.1 Geophysical Survey Results 256<br />

Figure 15.1 Population Growth 1981-2009 262<br />

Figure 16.1 Proposed Developments in the Vicinity of the Dissolved Acetylene Project 270<br />

5100935.404 Environmental Statement August 2011 viii

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!