BOC Immingham Dissolved Acetylene Project Environmental Statement: Vol. 2 Main Text<br />

Map<br />

Ref.<br />

No<br />

1 BOC<br />

Developer Development Description NELC Planning ID<br />

and Application Date<br />

Construction of a plant to<br />

manufacture acetylene.<br />

2 C.A.T.C.H. Erect two storey extension to<br />

existing office block,<br />

proposed process unit,<br />

proposed canteen with<br />

support facilities, proposed<br />

scaffold training centre,<br />

proposed workshop with new<br />

car park facility.<br />

3 Aeolian Erection of two 3 MW wind<br />

turbines (maximum height of<br />

150 m) with ancillary<br />

development including new<br />

access.<br />

DC/247/11/IMM<br />

Scoping report<br />

submitted 23/03/11<br />

Planning Application<br />

due to be submitted in<br />

August 2011.<br />

DC/1114/09/IMM<br />

20/12/2009<br />

DC/827/08/IMM<br />

23/7/2008<br />

Table 16.1 Proposed Developments<br />

Notes Potential for Cumulative Effects<br />

Construction due to<br />

commence Q1 2012 with<br />

completion by end of Q3<br />

2012.<br />

Approved 2/11/10<br />

40 week construction<br />

programme due to complete<br />

in early March 2012. Thus<br />

the latter stages of the<br />

development could overlap<br />

with the first 1-3 months of<br />

the BOC development in Q1<br />

2012.<br />

Works during this time are<br />

expected be mostly internal,<br />

with some external finishing<br />

works and site clearance.<br />

NELC confirmed that ‘there<br />

were no objections on<br />

transport grounds and the<br />

anticipated construction<br />

traffic was not seen to be<br />

significant.’<br />

No decision as yet.<br />

12 month construction phase<br />

employing 15 people.<br />

Operational phase will result<br />

in 1 full time equivalent job.<br />

Construction Operation<br />

n/a (this<br />

development)<br />

n/a (this development)<br />

5100935.404 Environmental Statement August 2011 271<br />

Yes.<br />

No it is understood<br />

that construction is<br />

unlikely to take place<br />

during the same time<br />

period as the BOC<br />

The nature of the<br />

C.A.T.C.H and the BOC<br />

developments are such<br />

that they are unlikely to<br />

result in cumulative<br />

impacts and these will<br />

not be considered in the<br />

EIA.<br />

Yes