BOC Immingham Dissolved Acetylene Project Environmental Statement: Vol. 2 Main Text<br />

Table 7.3 Land Contamination Impact Assessment for Construction Phase<br />

Receptor Baseline Risk Construction<br />

Phase<br />

Significance<br />

Human (on site) Very Low Risk Low Risk Minor Adverse<br />

Human (offsite) Very Low Risk Very Low Risk Neutral<br />

Groundwater Very Low Risk Low Risk Minor Adverse<br />

Surface Water Very Low Risk Low Risk Minor Adverse<br />

Property (on site crops) Very Low Risk No Risk (not<br />

present)<br />

n/a (not present)<br />

Property (offsite crops) Very Low Risk Very Low Risk Neutral<br />

Property (offsite buildings) Very Low Risk Very Low Risk Neutral<br />

Operation<br />

7.75 As for the construction phase assessment above, the land contamination impact assessment for<br />

operation is based on the change in risk between the baseline and the operational phase. The<br />

potential effects of the operational phase activities will also be contained and or controlled by<br />

appropriate buildings design (e.g. selection of materials, appropriate bunding etc).<br />

7.76 Good practice methods will be employed which will include measures to minimise prevent creation<br />

of sources and pathways. The Dissolved Acetylene facility will be operated in line with BAT and<br />

the requirements of the EP. An operational EMP and WMP will be developed and implemented as<br />

part of the EMS for the site. On the basis of the above, the operational phase contamination risk<br />

assessment is summarised as follows:<br />

� on site human receptors (future site users): the probability of the PPL is considered ‘unlikely’<br />

and the consequence is considered ‘mild’. Operational activities are unlikely to result in<br />

exposure to contaminants in soil (if these are present), or to vapour ground gas because of<br />

source removal pathway barriers. The risk identified is ‘very low’;<br />

� offsite human receptors: the probability of the PPL is considered ‘unlikely’ and the<br />

consequence is considered ‘mild’. Operational activities are unlikely to result in exposure to<br />

windblown soil-derived dust contamination (because of pathway barriers), or to migrating<br />

vapours ground gas (because of no source or source removal). The risk is identified as ‘very<br />

low’;<br />

� controlled waters receptors (groundwater in the Superficial Deposits): the probability of the<br />

PPL is considered ‘unlikely’ and the consequence is considered ‘mild’. Operational activities<br />

are unlikely to result in release of contaminants to ground groundwater because of pollution<br />

prevention measures, operating practices and management techniques. The risk is identified<br />

as ‘very low’;<br />

� controlled waters receptors (Humber Estuary): the probability of the PPL is considered<br />

‘unlikely’ and the consequence is considered ‘mild’. Operational activities are unlikely to<br />

result in release of contaminants to surface water (via groundwater) because of pollution<br />

prevention measures, operating practices and management techniques. The risk is identified<br />

as ‘very low’;<br />

5100935.404 Environmental Statement August 2011 108