BOC Immingham Dissolved Acetylene Project Environmental Statement: Vol. 2 Main Text<br />

� ABB Limited, BOC Dissolved Acetylene Project, Hazard Study 1 and 2 Report, dated<br />

February 2011;<br />

� BOC internal guidance on chemical storage and spills; and<br />

� a site visit by Atkins on Tuesday 1st March 2011.<br />

7.23 GI works have been undertaken recently by ESG to obtain geotechnical and geo-environmental<br />

information. Works did not commence until 27 th June 2011 consequently, the full GI report,<br />

including geo-environmental information, will not be available until after the ES has been finalised.<br />

The only information available at this time is preliminary site-specific geological, ground gas and<br />

groundwater information (from Borehole logs). Figure 7.1, indicates the location of the Borehole<br />

(BH), Trial Pit (TP) and Window Sample (WS) locations.<br />

5100935.404 Environmental Statement August 2011 92