05.02.2013 Views

View - North East Lincolnshire Council

View - North East Lincolnshire Council

View - North East Lincolnshire Council

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

BOC Immingham Dissolved Acetylene Project Environmental Statement: Vol. 2 Main Text<br />

Summary<br />

12.84 The significance of the key environmental impacts identified in the study area during the<br />

construction and operational phases are:<br />

� Hobson Way No Significant Effect;<br />

� Kiln Lane No Significant Effect;<br />

� the A1173 No Significant Effect; and<br />

� the A180 No Significant Effect.<br />

12.85 Notwithstanding this, a framework CTMP and FMP have been prepared (see Annex 12). As the<br />

precise nature of construction works and programming will be determined following the<br />

appointment the Construction Contractor, the framework CTMP is an organic document that will<br />

be updated as new information becomes available. The framework FMP has been prepared to<br />

provide potential measures to reduce freight on the road network (see Appendix 12A). Subject to<br />

granting of Planning Consent (and prior to the start of operations on site) the FMP will be updated<br />

in line with prevailing good practice.<br />

5100935.404 Environmental Statement August 2011 223

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!