BOC Immingham Dissolved Acetylene Project Environmental Statement: Vol. 2 Main Text<br />

Development Site<br />

Location<br />

2.4 It is proposed to build and install the acetylene plant within the area outlined in red (‘the<br />

development area’) as shown on the Location Plan (Figure 1.2). The approximate centre of the<br />

development area is OS Grid Reference TA 221 134 (NGR 522105 413465).<br />

Development Footprint<br />

2.5 The field that houses the proposed development is 9.4 ha in area. As indicated in Figure 1.2, the<br />

overall development area takes up less than half the field and is approximately 4.2 ha in area.<br />

This area includes space for the new acetylene plant as well as for temporary construction<br />

facilities. Within this the new roads and the main site process area will take up around 1.5 ha. In<br />

addition to the main site area there will be Deluge Tanks, Embankments, an Amenities Building<br />

and a Deluge Water Lagoon, thus the overall footprint of the development in terms of land-take<br />