BOC Immingham Dissolved Acetylene Project Environmental Statement: Vol. 2 Main Text<br />

Baseline Description<br />

Overview<br />

8.17 The most significant surface water feature in the vicinity of the proposed Dissolved Acetylene<br />

Project is the Humber Estuary; approximately 1 km to the north east of the development site.<br />

8.18 Middle Drain, which is operated by NELDB, forms the north western boundary of the development<br />

area and discharges to the Humber Estuary. Oldfleet Drain is located approximately 900 m to the<br />

south east of the development site and discharges into the Humber Estuary at a distance of<br />

approximately 1.8 km to the south east of the development site. <strong>North</strong> Beck Drain is approximately<br />

1.6 km to the north west of the development site and it discharges to the Humber Estuary<br />

approximately 1.9 km from the proposed site. The location of Middle Drain, Oldfleet Drain and<br />

<strong>North</strong> Beck Drain are illustrated in Figure 8.2.<br />

8.19 Other than Middle Drain where it will be crossed by the new bridge, there are no permanent<br />

surface water features on the site. There is a ditch along part of the northern verge of South<br />

Marsh Road, in the Anglian Water easement area. The former route of Middle Drain, in the north<br />

west corner of the development area, is now a depression with steep banks. Both of these<br />

features are seasonal and regularly dry out.<br />

8.20 There is a south east to north west running drain, which is parallel to (and on the other side of)<br />

Hobson Way and which drains into Middle Drain. There is a ditch (standing water) which runs<br />

along part of the southern verge of South Marsh Lane. There is a south east to north west running<br />

drain, which is parallel to (and on the far side of) the Grimsby Light Railway and which discharges<br />

into Middle Drain.<br />

8.21 The fields to the south east, south and south west are drained by a series of predominantly south<br />

east to north west running ditches which discharge into Middle Drain. The land to the north east is<br />

drained by a series of predominantly south west to north east running ditches which discharge into<br />

a drain that runs adjacent to and parallel to the Humber Estuary. This drain discharges into Middle<br />

Drain. Land to the north and north west is drained by ditches which discharge predominantly into<br />

Middle Drain.<br />

8.22 In the wider area, the land surrounding the development site is drained by a network of field drains<br />

which ultimately flow into the larger drains which discharge to the Humber.<br />

8.23 The location of the smaller drains and ditches within 2 km of the development area is illustrated in<br />

Figure 10.1 in the ecology chapter.<br />

8.24 None of the field drains enters the proposed development area and there is no hydraulic continuity<br />

between the development area and these drains.<br />

8.25 There are no public foul or surface water sewers in the area.<br />

8.26 Thus, the surface water receptors for the Dissolved Acetylene Project are Middle Drain and the<br />

Humber Estuary and these are described in more detail in the following sections.<br />

5100935.404 Environmental Statement August 2011 115