BOC Immingham Dissolved Acetylene Project Environmental Statement: Vol. 2 Main Text<br />

9.12 In addition, ongoing consultation with the Development Control section at the EA has been<br />

undertaken to identify the EA’s key issues and requirements for the purpose of this FRA. More<br />

latterly (July 2011) NELC forwarded the Draft FRA and associated documentation (which form<br />

Annex 9) to the EA. The EA provided comments (see Table 5.3 for a summary of the comments<br />

and for the original letter Appendix 5B) on the Draft FRA on the 4 th August 2011. The Final FRA<br />

has been updated as a result of the EA’s comments and subsequent consultation 20, 21 .<br />

Other Information Data Sources<br />

9.13 The assessment is based on the data and information presented in the Project description for the<br />

development (Chapter 3). Other data sources include:<br />

� EA Flood Map;<br />

� Admiralty Chart tide data;<br />

� historical flooding records;<br />

� coastal flood defence details;<br />

� spot levels for the proposed development site;<br />

� Lidar DTM data for the proposed development site and surrounding area;<br />

� <strong>North</strong>ern Area Tidal Modelling Pilot Study Commission No AN645 (2007);<br />

� Humber Flood Risk Management Strategy, Planning for the Rising Tides (2005); and<br />

� <strong>North</strong> <strong>East</strong> <strong>Lincolnshire</strong> and <strong>North</strong> <strong>Lincolnshire</strong> SFRA (2007).<br />

Assessment Methodology<br />

9.14 This assessment of flood risk is primarily a desk-top study collating information on the current<br />

flood risk and the existing drainage systems for the proposed development site. The results from<br />

this work have been used to inform the baseline and the assessment of impacts associated with<br />

the proposed.<br />

9.15 A FRA has been undertaken in accordance with PPS 25 and this is included as Appendix 9A. The<br />

objectives for the FRA of the proposed development site are to establish:<br />

� the impacts of flooding on the development;<br />

� the impacts of the development on flood risk elsewhere; and<br />

� whether appropriate mitigation measures have been incorporated into the design of the<br />

development to minimise risks to people and property on the site and elsewhere.<br />

9.16 The assessment covers the potential risk of flooding from the prime sources i.e. the Humber<br />

Estuary (tidal) and Middle Drain (fluvial) and from other possible sources such as groundwater,<br />

rainwater (pluvial) and sewers.<br />

Assessment Criteria<br />

9.17 There is no standard methodology for assessing the magnitude of impacts of development on the<br />

water environment. A methodology for assessing the significance of any impacts identified has,<br />

therefore, been developed in the context of the Water Act (2003), the Land Drainage Act (1991)<br />

and the Flood and Water Management Act (2010).<br />

9.18 The significance of the potential impacts of the development on flood risk have been categorised<br />

using the criteria outlined in Table 9.1.<br />

5100935.404 Environmental Statement August 2011 130