BOC Immingham Dissolved Acetylene Project Environmental Statement: Vol. 2 Main Text<br />

Significance<br />

Criteria<br />

Table 9.1 Assessment of Impacts<br />

Description of Criteria Example of Criteria<br />

Major adverse The development has a high probability of<br />

flooding.<br />

The proposal will have severe detrimental<br />

effects upon local watercourses estuary.<br />

Moderate<br />

adverse<br />

The development has a medium probability<br />

of flooding.<br />

The proposal may result in moderate<br />

detrimental effects upon local<br />

watercourse/estuary.<br />

Minor adverse The development has a low probability of<br />

flooding.<br />

The proposal may result in temporary and<br />

minor detrimental effects to local<br />

watercourses estuary.<br />

Negligible The proposal results in no appreciable impact<br />

on watercourses estuary.<br />

Minor beneficial The proposals may result in minor reduction<br />

in flood risk.<br />

Moderate<br />

beneficial<br />

The proposals may result in moderate<br />

reduction in flood risk.<br />

Permanent flooding or<br />

change to flow<br />

characteristics of<br />

watercourses.<br />

Severe temporary flooding or<br />

change to flow<br />

characteristics of<br />

watercourses.<br />

Moderate localised flooding.<br />

Any minor effects are<br />

reversible.<br />

Minor reduction in flood risk.<br />

Moderate reduction in flood<br />

risk.<br />

Major beneficial Major reduction in flood risk. Moderate to significant<br />

localised/regionalised<br />

reduction in flood risk.<br />

9.19 In applying the above impact assessment, if a major moderate adverse impact is identified,<br />

mitigation measures will be developed to reduce or mitigate that impact. It is likely that any major<br />

impacts would be a material consideration in the decision making process for the development.<br />

However, minor or negligible significance of impacts are unlikely to represent a constraint on the<br />

development.<br />

9.20 The impact of flood risk on the proposed development has been undertaken primarily through the<br />

assessment of breach and overtopping Flood Hazard Ratings provided by the EA for the site. The<br />

methodology used to assess the impact of the development on flood risk is described in more<br />

detail in the impact assessment sections.<br />

Baseline Description<br />

Introduction<br />

9.21 This section outlines the baseline conditions for the site in terms of the tidal environment; the<br />

fluvial environment; the groundwater environment; coastal defences and tidal flooding; fluvial<br />

flooding and drainage. A detailed FRA has been provided in Annex 9 and this should be referred<br />

to alongside this Chapter.<br />

5100935.404 Environmental Statement August 2011 131