BOC Immingham Dissolved Acetylene Project Environmental Statement: Vol. 2 Main Text<br />

Table 12.4 Operational Vehicle Movements<br />

Activity Frequency of Activity<br />

Collection of acetylene cylinders 6 deliveries/ collections per day<br />

Deliveries of calcium carbide 2 deliveries per week<br />

Delivery of sodium hydroxide/ sulphuric acid 1 delivery per fortnight<br />

Collection of lime by-product 3 collections per day<br />

Collection of scrubber effluent for disposal 1 collection per month<br />

Delivery of acetone nitrogen 1 delivery per month<br />

Delivery of biocide and corrosion inhibitor 1 delivery per month<br />

Collection of unreacted carbide and coke 2 collections per week<br />

Collection of scrap cylinders 2 collections per annum<br />

Collection of cooling tower waste water 1 collection per annum<br />

12.33 The peak hour trip generation figures once the site is operational are provided in Table 12.5. An<br />

explanation of how these figures have been derived is provided in the TS (Appendix 12A).<br />

Table 12.5 Peak Hour Trip Generation Operational Phase<br />

Vehicle Type AM Peak PM Peak<br />

Arrivals Departures Arrivals Departures<br />

Cars Light vans 1 0 0 1<br />

HGVs 8 8 8 8<br />

Total 9 8 8 9<br />

Assessment Criteria<br />

12.34 The following criteria will be applied when assessing the magnitude of effects of the Project:<br />

� high significant increases in traffic volumes (+30%) and percentage of HGVs, and or<br />

dangerous increases in traffic speeds;<br />

� moderate increases in traffic volumes and percentage of HGVs in excess of 10%;<br />

� minor increases in traffic volume and percentage of HGVs of up to 10%, and<br />

� negligible no real increase in traffic volume and percentage of HGV, and no real change in<br />

traffic speeds.<br />

12.35 The identification of receptors and the level of sensitivity to traffic flow changes are discussed in<br />

the following section, but the significance of impacts will be judged according to the magnitude of<br />

effects and the sensitivity of receptors, as shown in Table 12.6.<br />

5100935.404 Environmental Statement August 2011 211