BOC Immingham Dissolved Acetylene Project Environmental Statement: Vol. 2 Main Text<br />

12.43 The calculated accident rates for all routes are lower than the national average, and therefore<br />

based on this information the surrounding highway network does not appear to have any inherent<br />

safety concerns.<br />

12.44 The severity ratio of accidents is calculated using the equation below:<br />

12.45 During the three year period, Routes A and C did not experience any serious or fatal accidents<br />

and, as such, the severity ratio is 0. There was however one serious accident on Route B,<br />

therefore the severity ratio is 0.33.<br />

Highway Network and Receptors<br />

Overview<br />

12.46 The proposed development would be located on land adjacent to the existing BOC facility that is<br />

located off Hobson Way, near Immingham. The site is well served by the existing highway<br />

infrastructure as shown in Figure 12.1 overleaf. The site is connected to the strategic road<br />

network, the A180, either via Kiln Lane to the north west or South Marsh Road to the south east;<br />

both roads link on to the A1173 before joining the A180.<br />

Figure 12.1 Road Network in Vicinity of Development Site<br />

5100935.404 Environmental Statement August 2011 214

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!