BOC Immingham Dissolved Acetylene Project Environmental Statement: Vol. 2 Main Text<br />

� on site property receptors (buildings infrastructure): this is a new PPL because property was<br />

not present in the baseline. The probability of the PPL is considered ‘unlikely’ and the<br />

consequence is considered ‘minor’. Appropriate building materials will be used to prevent<br />

derogation by contaminants (which, if present, may also have been removed). Vapour ground<br />

gas measures will have been implemented (if required). The risk is identified as ‘very low’;<br />

� on site property receptors (crops): this PPL no longer exists as the on site crops will have<br />

been removed;<br />

� offsite property receptor (crops): the probability of the PPL is considered ‘unlikely’ and the<br />

consequence is considered ‘mild’. Operational activities are unlikely to result in exposure to<br />

windblown, soil-derived dust contamination (because of pathway barriers) or in migration of<br />

contaminants through groundwater (because of source removal, if present in the first<br />

instance). The risk is identified as ‘very low’; and<br />

� offsite property receptor (buildings): the probability of the PPL is considered ‘unlikely’ and the<br />

consequence is considered ‘mild’. Operational activities are unlikely to result in migration in<br />

groundwater or migration of vapours ground gas (because of source removal). The risk is<br />

identified as ‘very low’.<br />

7.77 Based on the above, the impact assessment is summarised in Table 7.4.<br />

Table 7.4 Contamination Impact Assessment for the Operational Phase<br />

Receptor Baseline Risk Operational Phase Significance<br />

Human (on site) Very Low Risk Very Low Risk Neutral<br />

Human (offsite) Very Low Risk Very Low Risk Neutral<br />

Groundwater Very Low Risk Very Low Risk Neutral<br />

Surface Water Very Low Risk Very Low Risk Neutral<br />

Property (on site<br />

buildings)<br />

No Risk (not<br />

present)<br />

Very Low Risk Minor Adverse<br />

Property (on site crops) Very Low Risk No Risk (Not Present) n/a (not present)<br />

Property (offsite crops) Very Low Risk Very Low Risk Neutral<br />

Property (offsite buildings) Very Low Risk Very Low Risk Neutral<br />

Mitigation Measures<br />

Construction<br />

7.78 The assessment of construction impacts has been undertaken on the basis that good practice will<br />

be employed and that a comprehensive CEMP will be prepared. The significance of construction<br />

impacts has been assessed to be ‘Minor Adverse’ or ‘Neutral’. On this basis, no mitigation<br />

measures are required.<br />

Operation<br />

7.79 Operational process emissions will be controlled as a result of the Project design (e.g. the<br />

requirements of BAT), the implementation of good practice and regulation, monitoring and control<br />

measures (e.g. through the EP and the EMS).<br />

7.80 The significance of operational impacts has been assessed to be ‘Minor Adverse’ or ‘Neutral’. On<br />

this basis, no mitigation measures are required<br />

5100935.404 Environmental Statement August 2011 109