BOC Immingham Dissolved Acetylene Project Environmental Statement: Vol. 2 Main Text<br />

Mitigation Measures<br />

Construction<br />

9.94 With appropriate good working practices and the production and implementation of the CEMP, it is<br />

expected that there will be no significant flood risk impacts during the construction phase of the<br />

development. Therefore no specific mitigation measures are deemed necessary.<br />

Operation<br />

9.95 Flood risk will be managed through providing safe refuges above the breach water level within the<br />

Generator Building; providing secondary flood protection to electrical equipment through water<br />

tight doors; providing a flood warning system; safe evacuation routes; and evacuation procedures.<br />

Consideration has been given to reducing the risk to buildings by providing flow paths which divert<br />

flows away from the building. Surface water runoff will be managed through an appropriately<br />

designed surface water drainage system and pumping station which outfalls into Middle Drain.<br />

9.96 Thus, flood risk to, or resulting from, the operation of the Dissolved Acetylene Project is not<br />

expected to be significant and specific additional mitigation measures are not proposed.<br />

Residual Impact Assessment<br />

9.97 Since no mitigation measures are proposed in relation to impacts associated with flooding the<br />

significance of impacts during construction and throughout the operation of the site does not<br />

change from that described above.<br />

Recommendations<br />

9.98 BOC should continue to liaise with the EA to ensure they are informed of any changes to the<br />

standard of protection provided by the coastal defences and any changes to the flood warning<br />

system provided.<br />

9.99 BOC should continue to liaise with NELDB to ensure they are informed of any changes to the<br />

standard of protection provided by the pumping station on Middle Drain.<br />

Summary<br />

9.100 An assessment of the flooding issues associated with the existing site and the construction and<br />

operational phases of the proposed Dissolved Acetylene Facility has been completed.<br />

9.101 There is no knowledge of flooding to the proposed development site to date from all potential<br />

identified sources, including, tidal, fluvial, groundwater, surface water and sewer flooding.<br />

9.102 The site is at high risk from tidal flooding but the site of the proposed Dissolved Acetylene Facility<br />

is currently protected to at least a 1 in 1,000 year tidal (0.1% AEP) event by coastal defences.<br />

During the construction and operation phases, the site has a residual risk from overtopping of the<br />

defences during more extreme tidal events (above 0.1% AEP) and from a breach of the coastal<br />

defences.<br />

9.103 The risk from the breach of the coastal defences will be managed by providing a flood warning<br />

system; safe evacuation routes; and evacuation procedures. During operation, safe refuges will be<br />

provided at 6.61 and 8.88 mAOD (above the breach water level of 6.45 mAOD) within the<br />

Generator Building and secondary flood protection to electrical equipment will be provided through<br />

water tight doors. On this basis the tidal flood risk is considered to be negligible for both<br />

construction and operation.<br />

5100935.404 Environmental Statement August 2011 142