BOC Immingham Dissolved Acetylene Project Environmental Statement: Vol. 2 Main Text<br />
Map<br />
Ref.<br />
No<br />
Developer Development Description NELC Planning ID<br />
and Application Date<br />
7 Vireol PLC Development of a Bioethanol<br />
production facility,<br />
associated structures and<br />
pipes including a feed stock<br />
reception and storage<br />
facilities, process plant and<br />
equipment, and ethanol<br />
storage tanks, the re-use of<br />
existing buildings for<br />
administration, operation and<br />
control buildings, by-product<br />
storage and distribution, with<br />
access from Fifth Avenue.<br />
8 Magna<br />
Holdings<br />
9 Real<br />
Ventures<br />
Outline application with<br />
access and layout details for<br />
mixed B1, B2, B8 industrial<br />
park with ancillary A3, A4, A5<br />
units<br />
Biomass power station, 49<br />
MW, burning clean wood.<br />
DC/225/10/WOL<br />
22/3/2010<br />
DC/730/07/IMM<br />
21-06-2007<br />
Approved 3/10/2008<br />
n/a<br />
due to submit in<br />
August 2011<br />
Notes Potential for Cumulative Effects<br />
Decision pending.<br />
Construction phase due to<br />
last 30 months with a peak<br />
workforce of 700.<br />
Operational phase will<br />
require 70 staff.<br />
It is noted that the<br />
development is in Grimsby<br />
rather than Stallingborough<br />
and so vehicles accessing<br />
the development are likely to<br />
use a different road network.<br />
It is understood that there are<br />
no plans to undertake any<br />
works in the near future and<br />
that the land may be up for<br />
sale.<br />
Project due to be announced<br />
on 10/6/11, with Planning<br />
Application due to be<br />
submitted in August 2011<br />
and construction<br />
commencing in Q1 2012.<br />
Construction Operation<br />
Yes.<br />
Construction is not<br />
likely to start in 2011.<br />
The developers are<br />
still trying to secure<br />
funding. However it<br />
is possible that<br />
construction could<br />
start during the BOC<br />
construction phase<br />
and therefore, as a<br />
worst case,<br />
cumulative impacts<br />
will be considered.<br />
No considered highly<br />
unlikely that the<br />
construction will<br />
commence during<br />
the same period as<br />
the BOC Project.<br />
5100935.404 Environmental Statement August 2011 273<br />
Yes.<br />
The Planning<br />
Application is in outline<br />
form only and the<br />
development will be<br />
speculative. Details of<br />
the development are<br />
therefore not fully known<br />
and it is not feasible to<br />
quantify cumulative<br />
impacts at this time.<br />
Possible for certain EIA topic areas, however the<br />
project is at an early stage of development.<br />
Details are not yet available and are not likely to<br />
be available for inclusion in the BOC project EIA.<br />
Thus, the Biomass developers will need to<br />
account for the potential cumulative impacts of<br />
their development and the BOC development in<br />
their EIA.