BOC Immingham Dissolved Acetylene Project Environmental Statement: Vol. 2 Main Text<br />

Map<br />

Ref.<br />

No<br />

Developer Development Description NELC Planning ID<br />

and Application Date<br />

7 Vireol PLC Development of a Bioethanol<br />

production facility,<br />

associated structures and<br />

pipes including a feed stock<br />

reception and storage<br />

facilities, process plant and<br />

equipment, and ethanol<br />

storage tanks, the re-use of<br />

existing buildings for<br />

administration, operation and<br />

control buildings, by-product<br />

storage and distribution, with<br />

access from Fifth Avenue.<br />

8 Magna<br />

Holdings<br />

9 Real<br />

Ventures<br />

Outline application with<br />

access and layout details for<br />

mixed B1, B2, B8 industrial<br />

park with ancillary A3, A4, A5<br />

units<br />

Biomass power station, 49<br />

MW, burning clean wood.<br />

DC/225/10/WOL<br />

22/3/2010<br />

DC/730/07/IMM<br />

21-06-2007<br />

Approved 3/10/2008<br />

n/a<br />

due to submit in<br />

August 2011<br />

Notes Potential for Cumulative Effects<br />

Decision pending.<br />

Construction phase due to<br />

last 30 months with a peak<br />

workforce of 700.<br />

Operational phase will<br />

require 70 staff.<br />

It is noted that the<br />

development is in Grimsby<br />

rather than Stallingborough<br />

and so vehicles accessing<br />

the development are likely to<br />

use a different road network.<br />

It is understood that there are<br />

no plans to undertake any<br />

works in the near future and<br />

that the land may be up for<br />

sale.<br />

Project due to be announced<br />

on 10/6/11, with Planning<br />

Application due to be<br />

submitted in August 2011<br />

and construction<br />

commencing in Q1 2012.<br />

Construction Operation<br />

Yes.<br />

Construction is not<br />

likely to start in 2011.<br />

The developers are<br />

still trying to secure<br />

funding. However it<br />

is possible that<br />

construction could<br />

start during the BOC<br />

construction phase<br />

and therefore, as a<br />

worst case,<br />

cumulative impacts<br />

will be considered.<br />

No considered highly<br />

unlikely that the<br />

construction will<br />

commence during<br />

the same period as<br />

the BOC Project.<br />

5100935.404 Environmental Statement August 2011 273<br />

Yes.<br />

The Planning<br />

Application is in outline<br />

form only and the<br />

development will be<br />

speculative. Details of<br />

the development are<br />

therefore not fully known<br />

and it is not feasible to<br />

quantify cumulative<br />

impacts at this time.<br />

Possible for certain EIA topic areas, however the<br />

project is at an early stage of development.<br />

Details are not yet available and are not likely to<br />

be available for inclusion in the BOC project EIA.<br />

Thus, the Biomass developers will need to<br />

account for the potential cumulative impacts of<br />

their development and the BOC development in<br />

their EIA.