BOC Immingham Dissolved Acetylene Project Environmental Statement<br />

Designated Site<br />

Qualifying Interest<br />

Features<br />

Presence of Qualifying Feature in Relation to Proposed Development<br />

and Likelihood for Impacts to Occur<br />

temporary duration with the most likely disturbing activity, piling, only<br />

taking ~3 weeks to complete. Worst case noise predictions, which are<br />

unlikely to be a reality, indicate that birds are unlikely to be disturbed such<br />

that they would be displaced from the surrounding high-tide roosts.<br />

Although significant negative impacts as a result of construction activities<br />

are not predicted, a Construction Ornithological Monitoring Programme<br />

(COMP) has been proposed (as described in Appendix 10A). This will be<br />

part of the CEMP. In brief, the COMP would enable determination of<br />

whether working practices on site require amending to reduce the number<br />

of disturbance events and thus minimise negative impacts (as / if<br />

applicable).<br />

The assessment has predicted that the proposed Dissolved Acetylene<br />

Project will not result in a negative effect upon the conservation objectives<br />

of the Humber Estuary SPA or Ramsar site either alone or in-combination<br />

with other projects and no adverse effects upon the integrity of the Humber<br />

Estuary SSSI/SPA/Ramsar site is anticipated.<br />

Impact<br />

Significance<br />

5100935.404 Environmental Statement August 2011 172