BOC Immingham Dissolved Acetylene Project Environmental Statement: Vol. 2 Main Text<br />

� mild: no appreciable damage to human health, exposure to hazardous substances likely to<br />

result in limited, not reportable health effects and below workplace exposure limits. Pollution<br />

of non-sensitive water resources (low-level pollution of a principal aquifer outside a<br />

groundwater source protection zone and industrial agricultural abstraction). Significant<br />

damage to buildings and foundations but not resulting in the buildings being unsafe for<br />

occupation and damage to services but not sufficient to impair their function. Harm to crops<br />

but not resulting in a substantial loss in value or diminution in yield (less than 20% reduction),<br />

limited harm to livestock, domesticated animals or wild animals; and<br />

� minor: non-permanent harm to human health (easily prevented by means such as personal<br />

protective clothing). No appreciable pollution of a water resource. Easily repairable damage<br />

to buildings, structures and services. No appreciable harm to livestock, domesticated and<br />

wild animals, crops and domestically grown produce.<br />

7.36 The land contamination risk, which is a function of the probability and the consequence, can then<br />

be defined using the risk matrix in Table 7.1, which is taken from R&D 66 48 .<br />

Probability<br />

High<br />

Likelihood<br />

Table 7.1 Risk Estimation based on Probability and Consequence<br />

Consequence<br />

Severe Medium Mild Minor<br />

Very High Risk High Risk Moderate Risk Moderate Low<br />

Risk<br />

Likely High Risk Moderate Risk Moderate Low<br />

Risk<br />

Low<br />

Likelihood<br />

Unlikely Moderate Low<br />

Risk<br />

Moderate Risk Moderate Low<br />

Risk<br />

7.37 Descriptions of the classified risks given in R&D 66 48 are as follows:<br />

Low Risk<br />

Low Risk Very Low Risk<br />

Low Risk Very Low Risk Very Low Risk<br />

� very high risk: there is a high probability that severe harm could arise to a receptor from an<br />

identified hazard without remediation action or there is evidence that severe harm to a<br />

receptor is already occurring. Realisation of that risk is likely to present a substantial liability<br />

to the site owner or occupier. Investigation is required as a matter of urgency and<br />

remediation works are likely to follow in the short term;<br />

� high risk: harm is likely to arise to a receptor from an identified hazard without remediation.<br />

Realisation of the risk is likely to present a substantial liability to the site owner or occupier.<br />

Investigation is required as a matter of urgency to clarify the risk. Remediation works may be<br />

necessary in the short term and are likely over the longer term;<br />

� moderate risk: it is possible that harm could arise to a receptor from an identified hazard.<br />

However, it is either relatively unlikely that any such harm would be severe and if any harm<br />

was to occur it is more likely that the harm would be relatively mild. Further investigative work<br />

is normally required to clarify the risk and to determine the potential liability to site owner<br />

occupier. Some remediation works may be required in the longer term;<br />

5100935.404 Environmental Statement August 2011 97