BOC Immingham Dissolved Acetylene Project Environmental Statement: Vol. 2 Main Text<br />

Vibration<br />

11.65 It is anticipated that there will be negligible vibration impacts on local residential and commercial<br />

properties taking into account the likely plant and typical activities associated with the<br />

development and also the relatively large separation distances involved (i.e. 550 m to Poplar<br />

Farm).<br />

Impact Assessment<br />

Construction<br />

Noise<br />

11.66 The construction of the facility is expected to take approximately nine months to complete.<br />

Standard construction hours are expected to be from 0800 to 1600 hours Monday to Friday, with a<br />

10% allowance for working from 0800 to 2000 hours Monday to Saturday.<br />

11.67 Details of the plant and equipment that will be used during the construction period and their<br />

relative phasing are not known at this stage. However estimates of plant equipment types,<br />

numbers and the corresponding noise levels are provided in Table 11.7. It should be noted that, in<br />

practice, there could be changes in the plant and equipment used due to variations in the<br />

preferred construction methods adopted by the appointed Construction Contractor.<br />

Table 11.7 Anticipated Plant and Associated Noise Levels<br />

Plant Equipment Assumed<br />

Number in<br />

Use<br />

BS 5228 Reference Noise level (dB)<br />

LAeq,T at 10 m (per<br />

unit)<br />

Dozer 1 Table C.2 12 81<br />

Dumper trucks 3 Table C.2 30 79<br />

Digger 2 Table C.4 63 77<br />

Towed roller 1 Table C.2 36 81<br />

Tandem roller 1 Table C.2 37 79<br />

Mini digger 1 Table C.4 67 74<br />

Submersible pumps 2 Table C.2 45 65<br />

Telehandler 1 Table C.2 35 71<br />

Piling (Hammer Rig (4 t)) 2 Table C.3 2 87<br />

6T Dumper 2 Table C.4 6 79<br />

55T Crane 1 Table C.4 45 82<br />

Concrete pumps 2 Table C.4 26 75<br />

Total noise for all items of plant operating together 93<br />

5100935.404 Environmental Statement August 2011 199