BOC Immingham Dissolved Acetylene Project Environmental Statement: Vol. 2 Main Text<br />

Type of Plant<br />

Traffic<br />

Table 12.2 Daily Trip Generation Construction: Phase 2<br />

Vehicle Type Daily Trips (One-way)<br />

Month 7 Month 8 Month 9 Total<br />

Site deliveries Arctic or rigid 2 1 1 4<br />

BOC Contractor Car or light van 16 18 22 56<br />

Total Trips 18 19 23 60<br />

12.28 The total trip generation for the duration of the nine month construction period has been estimated<br />

by combining trip generation figures for Phase 1 with Phase 2 (see Table 12.3).<br />

Table 12.3 Daily Trip Generation Construction Period (Overall)<br />

Month Phase 1 Phase 2 Total<br />

Cars/ LGVs HGVs Cars/LGVs HGVs All Vehicles<br />

1 5 6 - - 11<br />

2 6 7 - - 13<br />

3 6 6 - - 12<br />

4 8 8 - - 16<br />

5 9 11 - - 20<br />

6 8 9 - - 17<br />

7 7 9 16 2 34<br />

8 5 7 18 1 31<br />

9 3 5 22 1 31<br />

12.29 The maximum number of daily trips is predicted to occur during month 7 when there will be 34<br />

one-way daily trips, of which 23 would be car/ light van trips and 11 would be HGV movements.<br />

12.30 It is understood that there will be no abnormal loads brought to the site by road during<br />

construction of the facility.<br />

Operational Staff Numbers and Shift Patterns<br />

12.31 Standard operating hours are 0600 to 2200 hours Monday to Friday. The acetylene facility will<br />

employ between 15 and 20 permanent staff. One of these will work a standard day, (for example<br />

from 0830 to 1700 hours); the remaining staff will be split across two day shifts (0600 to 1400<br />

hours and 1400 to 2200 hours).<br />

Operational Vehicle Movements<br />

12.32 In addition to staff arriving and leaving the site, it is expected that there will be two maintenance<br />

trips per month. In addition, the movements outlined in Table 12.4 are anticipated.<br />

5100935.404 Environmental Statement August 2011 210