BOC Immingham Dissolved Acetylene Project Environmental Statement<br />

Operation<br />

10.95 Table 10.8 provides a discussion of potential impacts on the qualifying interest features of<br />

the statutory designated Humber Estuary (incorporating all aspects of the qualifying<br />

features for the SSSI, SAC, SPA and Ramsar site) based on whether the qualifying features<br />

are likely to be within the zone of influence of the proposed development during operation<br />

and whether impacts could result in a significant effect.<br />

10.96 This information has been adapted from the information to support a HRA Stage 1<br />

Screening Report 6 .<br />

10.97 Table 10.9 discusses potential operational impacts on non-statutory designated sites,<br />

notable habitats and notable species together with the significance of effect on ecological<br />

receptors.<br />

10.98 The significance of effect takes into account measures which have been included within the<br />

design to avoid or reduce ecological impacts. In addition, it is noted that management of the<br />

site would be accredited under the ISO 14001 EMS, the new plant will require an EP from<br />

the EA to operate (and as a consequence will be required to demonstrate the application of<br />

BAT) and discharges to Middle Drain will be consented.<br />

5100935.404 Environmental Statement August 2011