BOC Immingham Dissolved Acetylene Project Environmental Statement<br />

Pedestrian and Cyclist Delay and Amenity<br />

12.72 Whilst there will be an increase in the volume of traffic using the designated route, the increase is<br />

not significant (i.e. less than a 30% increase) and is therefore unlikely to have any effect on the<br />

level of delay experienced by pedestrians and cyclists.<br />

Accidents and Safety<br />

12.73 As the traffic speeds of vehicles accessing the site during the construction phase are not expected<br />

to vary from baseline traffic speeds, there is not expected to be any associated increase in<br />

accidents resulting from speeding. The baseline analysis of accident records demonstrated that<br />

there are no significant accident clusters in the vicinity of the site, and therefore there is no reason<br />

to consider that the incidence or seriousness of accidents will be affected.<br />

Driver Delay<br />

12.74 Whilst there will be an increase in the volume of traffic using the designated route, the increase is<br />

not significant (i.e. less than a 30% increase) and is therefore unlikely to have any effect on the<br />

level of delay experienced by other road users.<br />

Significance of Impacts during Construction<br />

12.75 The significance of the construction period on the local highway network has been determined in<br />

accordance with the definitions in Table 12.6. A summary of the results of this process is<br />

presented in Table 12.15.<br />

Table 12.15 Significance of Impacts Construction Peak (2012)<br />

Receptor Sensitivity Magnitude<br />

Hobson Way Low Moderate<br />

Minor<br />

Kiln Lane Low Moderate<br />

Minor<br />

A1173 Low Moderate<br />

Minor<br />

A180 (southbound) Low Moderate<br />

Minor<br />

A180 (northbound) Low Moderate<br />

Minor<br />

High Medium Low Negligible<br />

Minor Not<br />

Significant<br />

Minor Not<br />

Significant<br />

Minor Not<br />

Significant<br />

Minor Not<br />

Significant<br />

Minor Not<br />

Significant<br />

12.76 Table 12.15 shows that there would be no significant impacts on the study area during the<br />

construction period.<br />

Operation<br />

Magnitude of Effects<br />

Not<br />

Significant<br />

Not<br />

Significant<br />

Not<br />

Significant<br />

Not<br />

Significant<br />

Not<br />

Significant<br />

12.77 The magnitude of the effect that vehicles are predicted to have during the operational phase on<br />

the specified study area is established in Table 12.16. Calculations have been based on the<br />

annualised number of operational vehicles predicted to occur during the year of opening,<br />

compared to the annualised baseline survey information plus nearby committed development<br />

traffic.<br />

5100935.404 Environmental Statement August 2011 220

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!