BOC Immingham Dissolved Acetylene Project Environmental Statement: Vol. 2 Main Text<br />

16.41 Table 16.2 gives an indication of the distances between the other proposed developments and the<br />

Dissolved Acetylene Project site. Table 16.2 also attempts to provide an indication of the<br />

distances between each development and key sensitive receptors. Poplar Farm is the closest<br />

sensitive human receptor to the Dissolved Acetylene Project. The Humber Estuary SAC, SPA,<br />

Ramsar Site and SSSI (and its associated species) is the most significant and sensitive ecological<br />

receptor.<br />

Map<br />

Ref.<br />

No<br />

Table 16.2 Development with the Potential for Cumulative Effects during Operation<br />

Development Distance (a) & Direction from BOC<br />

development<br />

1 BOC Dissolved<br />

Acetylene<br />

Project<br />

3 Aeolian Wind<br />

Turbines<br />

4 Abengoa Bioethanol<br />

Plant<br />

5 RWE Npower<br />

Renewables<br />

Biomass Plant<br />

7 Vireol Bioethanol<br />

Plant<br />

Distance (a)<br />

from Poplar<br />

Farm<br />

Distance<br />

from Humber<br />

Estuary<br />

- 650 m 1,000 m<br />

250-500 m to the NW in the field<br />

adjacent to the SW boundary of the<br />

existing BOC site.<br />

100 to 500 m to the SE (depending<br />

on the exact location of the plant<br />

within the development site) in the<br />

field adjacent to the south east<br />

boundary of the Dissolved<br />

Acetylene site.<br />

650 m 1,150 m<br />

650 m 1,000 m<br />

1,400 m to the SE 1,900 m 250 m<br />

1,500 m to the SE, adjacent to the<br />

south bank of Old Fleet Drain<br />

1,800 m 500 m<br />

Table Notes:<br />

a The distances given in this Table are approximations as in many cases the exact location of the proposed plant<br />

within the overall development area is not known.<br />

Air Quality<br />

16.42 The atmospheric emissions resulting from operation of the Dissolved Acetylene Project are<br />

reasonably specific to the process of manufacturing acetylene and will be different (in terms of<br />

type and potential effects) to those from a Bio-ethanol or Biomass Plant. Furthermore, the air<br />

quality assessment concluded that operational impacts of the Dissolved Acetylene Project on air<br />

quality would be of negligible significance. Thus it is considered highly unlikely that there could be<br />

any significant cumulative impacts as a result of the concurrent operational phases of the<br />

proposed developments.<br />

Geology, Hydrogeology and Land Quality<br />

16.43 The land quality assessment of the Dissolved Acetylene Project concluded that that there would<br />

be:<br />

� a very low risk of contamination to humans on site and offsite, offsite property (buildings and<br />

crops), groundwater and surface water, resulting in impacts of neutral significance; and<br />

� a low risk of contamination to buildings on site, resulting in adverse impacts of minor<br />

significance.<br />

5100935.404 Environmental Statement August 2011 278