BOC Immingham Dissolved Acetylene Project Environmental Statement: Vol. 2 Main Text<br />

9.61 The EA operates a flood warning service in areas at risk of flooding from rivers or the sea. Using<br />

the latest available technology staff monitor rainfall, river levels and sea conditions 24 hours a day<br />

and use this information to forecast the possibility of flooding. The site is situated within a larger<br />

geographical area from Immingham to Pyewipe where the EA provides a general Flood Watch<br />

early alert to possible flooding as shown in Figure 9.5. The forecasting of storm surges in the<br />

<strong>North</strong> Sea increases the likelihood that flood warnings will result in the successful warning of<br />

endangered people prior to the onset of flooding. During construction and throughout its<br />

operation, the proposed development site will be listed on the EA flood warning register.<br />

Figure 9.5 Flood Warning Area (EA 2011)<br />

9.62 A flood warning and emergency evacuation plan will be prepared and submitted to the LPA for<br />

approval before construction of the plant is completed. The emergency evacuation plan will<br />

include the following:<br />

� how the flood warning should be provided and disseminated;<br />

� what will be done to protect the critical infrastructure of the development and how easily<br />

damaged items will be relocated;<br />

� the availability of staff and time taken to respond to a flood warning;<br />

� the use of high level refuges for staff within the plant;<br />

� the time needed to evacuate the site;<br />

� provision of safe access to and from the development;<br />

� the ability to maintain key operations during a flood event; and<br />

Proposed Development Site<br />

� expected time taken to re-establish normal operation following a flood event.<br />

9.63 To ensure the effects of flood risk are minimised during construction, the work will be undertaken<br />

when flood events are unlikely and not predicted. Should a storm with flood potential be predicted<br />

then measures will be put in place to reduce the impacts of flooding, e.g. remove machinery from<br />

low-lying areas. With the measures outlined above, the construction impact from tidal flooding is<br />

considered to be reduced to negligible.<br />

5100935.404 Environmental Statement August 2011 138