BOC Immingham Dissolved Acetylene Project Environmental Statement: Vol. 2 Main Text<br />

Consultation<br />

Body<br />

Date of<br />

Response<br />

Consultees Responses Comments ES Response<br />

The lifetime of the development will need to be confirmed. The flood risk<br />

to the development, including an appropriate allowance for climate<br />

change, will then need to be considered over the lifetime of the<br />

development. If the development is required to remain operational during<br />

a flood event the 0.1% annual probability, plus an allowance for climate<br />

change flood event, should be considered for determining the level at<br />

which flood sensitive equipment and areas of safe refuge are set. Also,<br />

other parts of the development will need to be shown to be flood resilient<br />

easily recoverable following a flood.<br />

The proposal should be accompanied by a robust Flood Warning and<br />

Evacuation Plan. As part of this plan we recommend registration with the<br />

Environment Agency’s free Floodline Warnings Direct service.<br />

The EA considers the plans for the EIA to be appropriate for the site in<br />

terms of groundwater and land contamination. The site is considered to be<br />

of relatively low sensitivity with respect to groundwater issues.<br />

Nevertheless, the proximity of surface waters to the site warrants the<br />

additional works proposed in section 6.16 of the Scoping Report. Please<br />

note that any reports or investigations should be done in accordance with<br />

PPS 23 'Planning and Pollution Control' and Contaminated Land Report<br />

(CLR) 11 'Model Procedures for the Management of Land Contamination'.<br />

The operational lifetime of the development is 25<br />

years. A FRA has been carried out. The FRA has<br />

considered all of the EA’s requirements and is<br />

presented in Appendix 9A and summarised in<br />

Chapter 9: Flood Risk.<br />

The FRA resulted in the following recommendations,<br />

which BOC plans to follow:<br />

� during construction and throughout its operation<br />

the proposed Dissolved Acetylene facility should<br />

be included on the EA flood warning register; and<br />

� that a flood warning and emergency evacuation<br />

plan be prepared and submitted to the LPA for<br />

approval before construction of the plant is<br />

completed.<br />

Further information is presented in Appendix 9A.<br />

Section 16.6 referred to the collection of additional<br />

baseline data, including an intrusive ground<br />

investigation with appropriate representative soil and<br />

groundwater sampling and chemical analysis. The<br />

results of this exercise are provided in Chapter 7<br />

(Geology, Hydrogeology and Land Quality). The<br />

preparation of Chapter 7 has taken PPS 23 and<br />

CLR 11 into account.<br />

5100935.404 Environmental Statement August 2011 62