BOC Immingham Dissolved Acetylene Project Environmental Statement: Vol. 2 Main Text<br />

Consultation<br />

8.10 No specific consultation has been undertaken in the preparation of this Chapter. Most of the<br />

responses to the Scoping Report did not relate to water quality. The EA noted that the site is<br />

considered to be of relatively low sensitivity with respect to groundwater issues but the proximity<br />

of surface waters to the site warranted the proposed GI works (see Chapter 7). The EA also noted<br />

that the Scoping Report addressed the potential environmental risk to surface water and pointed<br />

out that the EA is already in discussions with BOC in relation to this issue and the EP.<br />

Other Information Data Sources<br />

8.11 The data sources used to develop the Scoping Report 3 have also been used to develop this ES<br />

chapter.<br />

8.12 Water quality data have been obtained from the EA to improve the understanding of the baseline<br />

condition of the study area. The data relating to the sampling locations described in Table 8.1 and<br />

illustrated on Figure 8.1 were deemed the most appropriate for the water quality assessment for<br />

the Dissolved Acetylene Project. No water quality data are available for the Middle Drain.<br />

8.13 Additional water quality data have been provided by the EA for sampling sites further upstream<br />

and downstream of the Middle Drain discharge point into the Humber Estuary. These datasets<br />

have not been considered in this assessment, as their value is limited due to the dilution capacity<br />

of the Humber. Therefore only data in proximity to the discharge is used to inform the baseline<br />

assessment.<br />

Table 8.1 Water Quality Sampling Locations and Duration<br />

Site ID Name NGR Monitoring<br />

Start Date<br />

Monitoring<br />

End Date<br />

14 R.Humber Courtaulds H/Water +2 (100m) TA2445513362 05/03/2008 12/04/2011<br />

15 R.Humber Courtaulds H/Water +2 (250m) TA2458813293 05/03/2008 12/04/2011<br />

16 R.Humber Courtaulds H/Water -1 (100m) TA2426913459 05/03/2008 12/04/2011<br />

17 R.Humber Courtaulds H/Water -1 (250m) TA2413613528 05/03/2008 12/04/2011<br />

18 R.Humber Doverstrand H/Water +1.5 TA2361313824 05/03/2008 12/04/2011<br />

19 R.Humber Doverstrand H/Water -2 TA2331614005 05/03/2008 12/04/2011<br />

24 R.Humber Millenium Ebb Lw -1.5 (100m) TA2232915198 08/01/2008 11/04/2011<br />

25 R.Humber Millenium Ebb Lw -1.5 (250m) TA2244415102 08/01/2008 11/04/2011<br />

26 R.Humber Millenium-Flood Lw+1.5(100m) TA2217515326 08/01/2008 11/04/2011<br />

27 R.Humber Millenium-Flood Lw+1.5(250m) TA2206015422 08/01/2008 11/04/2011<br />

30 R.Humber Novartis Ebb Lw -2.5 (100m) TA2582613100 08/01/2008 11/04/2011<br />

31 R.Humber Novartis Ebb Lw -2.5 (250m) TA2595213019 08/01/2008 11/04/2011<br />

32 R.Humber Novartis-Flood Lw+2(100m) TA2565813208 08/01/2008 11/04/2011<br />

33 R.Humber Novartis-Flood Lw+2(250m) TA2553213289 08/01/2008 11/04/2011<br />

35 R.Humber Tioxide Ebb Lw -1 (100m) TA2633314044 08/01/2008 11/04/2011<br />

36 R.Humber Tioxide Ebb Lw -1 (250m) TA2646513974 08/01/2008 11/04/2011<br />

37 R.Humber Tioxide Flood Lw +1 (100m) TA2615714138 08/01/2008 11/04/2011<br />

38 R.Humber Tioxide Flood Lw +1 (250m) TA2602514208 08/01/2008 11/04/2011<br />

5100935.404 Environmental Statement August 2011 112