BOC Immingham Dissolved Acetylene Project Environmental Statement: Vol. 2 Main Text<br />

� a new emergency access road from the south easterly corner of the one way loop road to<br />

South Marsh Road;<br />

� 2 m high earth embankments;<br />

� four main buildings:<br />

- Amenities Building (including toilets, mess room, office, communications room, boiler<br />

room and store),<br />

- Generator Building (including Safe Haven refuge areas on the first and second floors),<br />

- Cylinder & Bundle Filling Building (also housing a room for compression and an Electrical<br />

Switch Room), and<br />

- Cylinder Examination Shop (including a Paint Shop);<br />

� three Lime Storage Tanks and one or two Rotary Drum Filters;<br />

� two Deluge Water Tanks and an attenuation lagoon for deluge water;<br />

� areas for storage (cylinders, bundles (a number of cylinders manifolded together), materials,<br />

liquid nitrogen, chemicals and wastes);<br />

� areas for vehicle trailer filling, parking and turning;<br />

� a drivers’ shelter;<br />

� pipe racking; and<br />

� a new 2.4 m high paladin (or equivalent) security fence.<br />

3.119 The main building fabrication materials are likely to be metal, insulated panels. Due to the nature<br />

of the development, material selection is limited and needs to be based on process requirements<br />

(insulation, fire proofing, sound reduction etc.). The colour scheme and finish will be as per the<br />

existing BOC site (i.e. greys with a low sheen finish). The bridge deck and all the road and hard<br />

standings will be of concrete construction.<br />

Access and Accessibility<br />

3.120 The design assumed that site access is gained in the following ways:<br />

� normal operational traffic will access through the existing BOC site and across a new bridge<br />

over Middle Drain using a new short link road to the proposed site; and<br />

� emergency access and construction vehicles will access the site via South Marsh Road.<br />

3.121 During normal operation vehicular and pedestrian access and to the proposed site will be via the<br />

existing site entrance (on Hobson Way) and the main gatehouse. A junction will be formed with<br />

the existing site perimeter road to feed the new facility. A footway would run along the eastern<br />

side of the new bridge over the Middle Drain connecting to the new facility via a pedestrian<br />

crossing. A security barrier with intercom will be in place between the existing site gatehouse and<br />

the proposed site.<br />

3.122 Staff parking (including cycle and motor bike facilities) will be at the existing site car park, although<br />

two parking places, one disabled, will be available at the proposed site. Following organic growth<br />

in the existing site workforce BOC is planning to apply for consent to extend the existing car park<br />

(this is project is separate from and independent of the Dissolved Acetylene Project).<br />

5100935.404 Environmental Statement August 2011 37