BOC Immingham Dissolved Acetylene Project Environmental Statement: Vol. 2 Main Text<br />
Developer Description Application Ref. No. Decision<br />
Vireol PLC<br />
Vireol PLC<br />
Magna<br />
Holdings<br />
Real Ventures<br />
Moody Lane (Former Acordis<br />
Site), Great Coates, Grimsby.<br />
Erect Bio-ethanol production<br />
facility, assoc. structures and<br />
pipes to include a feed stock<br />
reception and storage, process<br />
plant and equipment, ethanol<br />
storage tanks, administration<br />
operation and control<br />
buildings, with access from<br />
Fifth Avenue.<br />
Development of a Bio-ethanol<br />
production facility, associated<br />
structures and pipes including<br />
a feed stock reception and<br />
storage facilities, process plant<br />
and equipment, and ethanol<br />
storage tanks, the re-use of<br />
existing buildings for<br />
administration, operation and<br />
control buildings, by-product<br />
storage and distribution, with<br />
access from Fifth Avenue.<br />
Outline application with access<br />
and layout details for mixed<br />
B1, B2, B8 industrial park with<br />
ancillary A3, A4, A5 units<br />
Biomass power station,<br />
49 MW, burning clean wood.<br />
Planning Consultations<br />
DC/202/08/WOL<br />
29/02/2008<br />
DC/225/10/WOL<br />
22/3/2010<br />
DC/730/07/IMM<br />
21-06-2007<br />
n/a due to submit in<br />
August 2011<br />
Conditionally<br />
Approved<br />
05/07/2010<br />
Decision pending<br />
Approved 3/10/2008<br />
4.20 Pre-application consultation has been undertaken with NELC on the planning issues associated<br />
with the development. This took the form of telephone consultation to inform the ES Scoping<br />
Report; a meeting in May 2011; and subsequent e-mail and telephone communications.<br />
4.21 The principal purpose of the consultation was to acquire relevant technical information, determine<br />
the scope of supporting information required to validate the Planning Application and, in particular,<br />
to seek agreement on those policy documents that are believed to have most relevance to<br />
consideration of the Planning Application for the BOC Dissolved Acetylene Project. The<br />
consultation was also used to identify whether there are any current planning consents that might<br />
have a bearing on the impact assessment, either interactively or cumulatively. The information<br />
presented above (and in Chapter 16) reflects the outcome of these consultations.<br />
Detailed information relating to the consultation approach associated with the Project is provided<br />
in the Statement of Community Involvement that supports the Planning Application.<br />
5100935.404 Environmental Statement August 2011 53