BOC Immingham Dissolved Acetylene Project Environmental Statement: Vol. 2 Main Text<br />

Water Use<br />

3.72 The proposed development will use two new water supplies from Anglian Water’s mains water<br />

supply on Hobson Way. The two supplies will be potable and non potable water. The potable<br />

water is a secure supply, whereas the non-potable supply cannot be guaranteed. The water use<br />

philosophy will be to use the non-potable water supply when and where possible. The Anglian<br />

Water supplies will be supplemented by water that is recycled from the process. In addition, (as<br />

described previously) a rainwater harvesting system will collect clean surface water runoff to<br />

augment the supply of process water.<br />

3.73 The water requirements for the process have been estimated at approximately 29,600 t/yr,<br />

approximately 8,660 t/yr of this will be provided by water that has been recycled from the process.<br />

Non-process water requirements are estimated at approximately 860 t/yr. Thus, mains water<br />

usage is expected to be in the region of 21,800 t/yr. In reality water usage will be lower, as these<br />

figures do not account for water that is collected by the rainwater harvesting system.<br />

Electricity<br />

3.74 All equipment involved in the manufacturing and cylinder filling processes will be electrically<br />

driven. Annual electricity use has been estimated at 1,515,035 kWh/yr.<br />

Gas Use<br />

3.75 The site has a requirement for a natural gas supply which will serve the new boiler house, which<br />

will be used for domestic purposes and heating buildings. The new facilities will be connected to<br />

the mains gas supply on Hobson Way. Annual gas usage has been estimated at 71,000 kWh/yr.<br />

Diesel Use<br />

3.76 Diesel use will be limited to firewater deluge pumps and forklift trucks. Diesel will be supplied via<br />

the existing site. The firewater pumps will be on skids with an integral diesel supply built in. The<br />

fire pumps will be run each month for 30 minutes to confirm availability. Total annual diesel use is<br />

estimate to be less than 5 m 3 /yr.<br />

Atmospheric Emissions<br />

3.77 Emissions to atmosphere will consist of acetylene, ammonia, phosphine, hydrogen sulphide and<br />

acetone. Ammonia, phosphine and hydrogen sulphide are only present as a result of the<br />

impurities in the raw carbide.<br />

3.78 An estimate of the likely emissions from the proposed facility has been produced using the EIGA<br />

methodology and spreadsheet 16 for the calculation of air emissions from an acetylene plant. This<br />

gave the following approximate values:<br />

� acetylene 22,000 kg/yr;<br />

� phosphine 1.9 kg/yr;<br />

� ammonia 2.2 kg/yr;<br />

� hydrogen sulphide 0.06 kg/yr; and<br />

� acetone