BOC Immingham Dissolved Acetylene Project Environmental Statement: Vol. 2 Main Text<br />

Respondent Issue Policy Legislation<br />

HA Requirement for consideration of the hazards<br />

associated with transportation of raw materials,<br />

finished product and waste products on the<br />

strategic road network. Supported by<br />

information on Emergency Planning at the Site,<br />

including:<br />

� strategy and arrangements for emergencies<br />

on or close to the A180;<br />

� proposals for implementing closures and or<br />

diversion routes if the A1173 A180 is<br />

compromised by any incident; and<br />

� proposals for buffer zones and emergency<br />

management relating to an incident on site.<br />

Summary of Key Planning Issues<br />

4.8 Taken together, the Scoping Opinion 4 and the policy review indicate that the following issues are<br />

of particular importance in achieving development proposals that are acceptable in terms of<br />

potential environmental impacts (references in brackets are to the pertinent planning<br />

policies/documents):<br />

� understanding and managing the risks of flooding associated with the industrial areas defined<br />

along the Humber Estuary, developing measures within the design of the Project to ensure<br />

flood resilience and avoid elevation of flood risk on site or offsite (PPS 25; Yorkshire and<br />

Humber Plan (RSS) Policies YH1 and ENV1);<br />

� assessing and responding to the potential impacts of the Project arising from proximity to the<br />

international and national ecological designations on the Humber Estuary, particularly in<br />

relation to SPA Bird Species (PPS 9; PPG 24; Consultation Paper on Natural and Healthy<br />

Environment PPS; RSS Policies YH1 and ENV8; NELC Local Plan (LP) Policies E2, NH1,<br />

NH2 and NH3, Local Development Framework (LDF) emerging Policy DM9);<br />

� achieving satisfactory access arrangements onto the site and managing impacts associated<br />

with likely traffic movements generated by the Scheme (PPS 1 and supplement to PPS1;<br />

PPG 13, RSS Policies YH7 and T1; NELC LP Policies T6 and T7; LSF emerging Policies<br />

SO6 and DM7);<br />

� controlling the potential noise impacts associated with the construction and operation of the<br />

Scheme (PPS 10; PPG 24; NELC LP Policy GEN1);<br />

� minimising the potential for the Project to give rise to pollution through the inclusion of<br />

appropriate controls (PPS 1 and supplement to PPS1; PPS 23; NELC LP Policy GEN8; LDF<br />

emerging Policies SO9 and DM10);<br />

� ensuring that the Project achieves a balance of effects across social, economic and<br />

environmental factors to deliver sustainable development (PPS 1; PPS 4; PPS 9; PPS 10;<br />

PPS 22; Consultation Paper on Natural and Healthy Environment PPS; RSS Policies YH1<br />

and ENV5; NELC LP Policy GEN1; LDF emerging Policies SO8, SO9, SP2, DM1 and DM10;<br />

and<br />

� delivering an acceptable relationship between the Project and surrounding land uses (PPS1;<br />

PPS 5; PPS 9; PPS 23; PPG 24; PPS 25; Consultation Paper on Natural and Healthy<br />

Environment PPS; RSS Policies YH1, ENV8, ENV9 and ENV10; NELC LP Policies GEN1,<br />

E1, E2, E12, NH1 and NH12; LDF emerging Policy SO5).<br />

5100935.404 Environmental Statement August 2011 48<br />

-