BOC Immingham Dissolved Acetylene Project Environmental Statement: Vol. 2 Main Text<br />

5.19 NELC invited the following consultees to comment on the Scoping Report 3 :<br />

� Anglian Water;<br />

� EA;<br />

� HA<br />

� <strong>Lincolnshire</strong> Wildlife Trust (LWT);<br />

� NE;<br />

� NELDB;<br />

� NELC Archaeological Officer;<br />

� NELC Drainage Department;<br />

� NELC Ecology Officer;<br />

� NELC Environmental Protection Department; and<br />

� NELC Highways Department.<br />

5.20 Responses were received from the EA, HA, LWT, NE and NELC Environmental Protection<br />

Department. Table 5.2 provides a summary of these responses in conjunction with an outline of<br />

how the scoping responses have been addressed within this ES (as appropriate). Further details<br />

are provided in the SCI.<br />

Consultation during Production of ES<br />

5.21 Since the Scoping Opinion 4 was received, NELC and the EA have been sent the Draft FRA for the<br />

Dissolved Acetylene Project. The EA responded with comments on the FRA on 4 th August 2011,<br />

the response is contained in ES Volume 3 Appendix 5B. Table 5.3 provides a summary of the EA<br />

response to the FRA, in conjunction with an outline of how the scoping responses have been<br />

addressed within this ES<br />

5.22 In addition, the following meetings have been held with the following consultees since the<br />

submission of the ES:<br />

� NELDB;<br />

� HA; and<br />

� HFRS.<br />

5.23 It is planned (though not arranged at the time of writing) to present the Project to Immingham<br />

Town <strong>Council</strong> (including an invitation to Stallingborough <strong>Council</strong> and the ward members for<br />

Immingham and Wolds) in August 2011.<br />

5.24 In addition, as part of the process of undertaking the EIA technical consultations have been<br />

undertaken with various organisations. More details of these consultations are provided in the<br />

chapters covering the individual EIA topics (see see Chapters 6 to 15). Further details are<br />

provided in the SCI.<br />

Consultation Following Submission of the ES<br />

5.25 In addition to NELC and its sub-departments, the consultees to whom the ES (by NELC) will be<br />

circulated include the following x :<br />

� Ambulance Service;<br />

x The list of consultees was provided by NELC in March 2011 and updated in July 2011.<br />

5100935.404 Environmental Statement August 2011 59