BOC Immingham Dissolved Acetylene Project Environmental Statement: Vol. 2 Main Text<br />

Respondent Issue Policy Legislation<br />

NE Noise - potential impacts of construction noise<br />

on SPA designated bird species, demonstrated<br />

via a worst case scenario noise plot.<br />

NE Air quality - assesses the potential impacts on<br />

designated habitats within 10 km of the Site.<br />

NE Seek to maximise opportunities to build in<br />

beneficial biodiversity or geological features<br />

within the design, in and around developments.<br />

Suggests:<br />

� altering farming practices in neighbouring<br />

fields to support SPA bird species;<br />

� wildflower meadow creation; and<br />

� bird, owl and bat boxes.<br />

EA Requirement for correct classification of the<br />

Project in relation to the flood risk vulnerability<br />

classification.<br />

EA Requirement for a FRA. Should incorporate an<br />

accurate assessment based on the predicted<br />

lifetime of the Project.<br />

EA Appropriate consideration of whether the<br />

Project is required to remain operational during<br />

a flood event; and appropriate evidence of if<br />

how this will be achieved (use 0.1% annual<br />

probability + climate change).<br />

EA Demonstration of the way in which flood<br />

resilience is incorporated into the design.<br />

EA Submission of a robust Flood Warning and<br />

Evacuation Plan for the Project.<br />

EA Conduct of the additional works set out in<br />

paragraph 6.16 of the Scoping Report in<br />

relation to GI works.<br />

HA Potential requirement for a traffic management<br />

plan for construction phase to minimise the<br />

impact on the local and strategic road<br />

networks.<br />

PPS 9 Biodiversity and<br />

Geological Conservation.<br />

Wildlife and Countryside Act<br />

1981 (as amended); the<br />

Habitats Regulations 2010.<br />

PPS 9 Biodiversity and<br />

Geological Conservation.<br />

Wildlife and Countryside Act<br />

1981 (as amended); the<br />

Habitats Regulations 2010.<br />

PPS 9 Biodiversity and<br />

Geological Conservation.<br />

<strong>Lincolnshire</strong> Biodiversity<br />

Action Plan.<br />

PPS 25 Development and<br />

Flood Risk, especially Table<br />

D2 and Table D3.<br />

PPS 25 Development and<br />

Flood Risk.<br />

PPS 25 Development and<br />

Flood Risk.<br />

PPS 25 Development and<br />

Flood Risk.<br />

PPS 25 Development and<br />

Flood Risk.<br />

PPS 23 Planning and<br />

Pollution Control.<br />

CLR 11 Model Procedures for<br />

the Management of Land<br />

Contamination.<br />

PPG 13 Transport.<br />

NELC Local Transport Plan 3.<br />

5100935.404 Environmental Statement August 2011 47