2009 - Ciputra Development
2009 - Ciputra Development
2009 - Ciputra Development
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
The original consolidated financial statements included herein are in<br />
the Indonesian language<br />
PT CIPUTRA DEVELOPMENT Tbk<br />
DAN ANAK PERUSAHAAN<br />
CATATAN ATAS LAPORAN KEUANGAN<br />
KONSOLIDASI<br />
Tahun yang Berakhir pada Tanggal-tanggal<br />
31 Desember 2010 dan <strong>2009</strong><br />
(Disajikan dalam rupiah, kecuali dinyatakan lain)<br />
PT CIPUTRA DEVELOPMENT Tbk<br />
AND SUBSIDIARIES<br />
NOTES TO THE CONSOLIDATED<br />
FINANCIAL STATEMENTS<br />
Years Ended<br />
December 31, 2010 and <strong>2009</strong><br />
(Expressed in rupiah, unless otherwise stated)<br />
11. HUTANG BANK (lanjutan) 11. LOANS FROM BANKS (continued)<br />
PT Bank Mega Tbk (Bank Mega)<br />
Pada tanggal 29 Februari 2008, WWR memperoleh<br />
fasilitas pinjaman berjangka dan fasilitas bunga<br />
selama konstruksi dari Bank Mega dengan pagu<br />
pinjaman masing-masing sebesar<br />
Rp389.970.000.000 dan Rp55.030.000.000, yang<br />
digunakan untuk membiayai proyek <strong>Ciputra</strong> World.<br />
Pada tanggal 28 Juli 2010, pagu pinjaman untuk<br />
fasilitas bunga telah ditingkatkan menjadi<br />
Rp88.255.000.000. Pinjaman ini dikenakan tingkat<br />
bunga tahunan berkisar antara 13,5% sampai<br />
dengan 14% pada tahun 2010 dan antara 14%<br />
sampai dengan 15% pada tahun <strong>2009</strong>. Fasilitas ini<br />
tersedia sampai dengan 31 Desember 2020,<br />
termasuk 2 tahun masa tenggang.<br />
Pada tahun 2010 dan <strong>2009</strong>, fasilitas ini dijamin<br />
dengan tanah dan bangunan dalam penyelesaian,<br />
serta aset pusat niaga dan tanah untuk<br />
pengembangan masing-masing dengan nilai<br />
tanggungan sampai dengan Rp599 miliar dan<br />
Rp100 miliar, dan tagihan piutang, jika ada, dengan<br />
nilai sebesar Rp15.566.999.166. Setiap<br />
peningkatan piutang akan dijadikan penambahan<br />
jaminan hutang (Catatan 5, 6 dan 8).<br />
Biaya pinjaman atas hutang ini dikapitalisasi ke<br />
aset tetap (Catatan 8).<br />
PT Bank Mandiri (Persero) Tbk<br />
PT Bank Mega Tbk (Bank Mega)<br />
On February 29, 2008, WWR obtained time loan<br />
and interest during construction credit facilities<br />
from Bank Mega with maximum credit limits of<br />
Rp389,970,000,000 and Rp55,030,000,000,<br />
respectively, which are used to finance the <strong>Ciputra</strong><br />
World Project. On July 28, 2010,the credit limit for<br />
the interest during construction facility was<br />
increased to Rp88,255,000,000. The loan from the<br />
facilities bears interest at annual rates ranging<br />
from 13.5% to 14% in 2010 and from 14% to 15%<br />
in <strong>2009</strong>. The facility is available until December 31,<br />
2020, including a grace period of 2 years.<br />
In 2010 and <strong>2009</strong>, this loan is collateralized by<br />
land and buildings under construction, and mall<br />
and land for development amounting to Rp599<br />
billion and Rp100 billion, respectively, and<br />
receivables, if any, amounting to<br />
Rp15,566,999,166. Any additional receivables will<br />
be used as collateral for this loan (Notes 5, 6 and<br />
8).<br />
The borrowing cost of this loan was capitalized to<br />
fixed assets (Note 8).<br />
PT Bank Mandiri (Persero) Tbk<br />
<br />
Pada tanggal 4 Juni 2010, CR memperoleh<br />
fasilitas kredit investasi dari PT Bank Mandiri<br />
(Persero) Tbk (Mandiri) dengan pagu pinjaman<br />
sebesar Rp36.000.000.000 yang digunakan<br />
untuk pembiayaan proyek taman bermain dan<br />
pusat makanan di Citra Raya Tangerang, dan<br />
pengembangan infrastruktur proyek<br />
perumahan Citra Garden Jakarta dan<br />
waterpark di Citra Grand Palembang. Pinjaman<br />
tersebut dikenakan tingkat bunga tahunan<br />
berkisar antara 10,00% sampai dengan<br />
10,50% pada tahun 2010. Pinjaman ini akan<br />
jatuh tempo pada tanggal 3 November 2013,<br />
termasuk 1 tahun masa tenggang. Angsuran<br />
pokok pinjaman diangsur setiap tiga bulan<br />
mulai tahun 2011 sampai dengan 2013. Saldo<br />
pinjaman pada tanggal 31 Desember 2010<br />
adalah sebesar Rp11.000.000.000.<br />
<br />
On June 4, 2010, CR obtained investment<br />
credit facility from PT Bank Mandiri (Persero)<br />
Tbk (Mandiri) with a maximum amount of<br />
Rp36,000,000,000 used to finance a theme<br />
park and food centre project at Citra Raya<br />
Tangerang, and the development of the<br />
infrastructure of Citra Garden Jakarta<br />
residential project and waterpark at Citra<br />
Grand Palembang. The loan bears interest at<br />
annual rates ranging from 10.00% to 10.50% in<br />
2010. The loan is due on November 3, 2013,<br />
including grace period of 1 year. The principal<br />
is paid quarterly starting from 2011 until 2013.<br />
The outstanding balance as of December 31,<br />
2010 amounted to Rp11,000,000,000.<br />
Pinjaman ini dijamin dengan tanah atas nama<br />
CR dan CPG, anak perusahaan CR, seluas<br />
12.754m2 dan dengan nilai tercatat sebesar<br />
Rp9.049.706.129.<br />
This loan is collateralized by land under the<br />
name of CR and CPG, a subsidiary of CR, with<br />
an area of 12,754sqm and carrying value of<br />
Rp9,049,706,129.<br />
61