22.01.2015 Views

2009 - Ciputra Development

2009 - Ciputra Development

2009 - Ciputra Development

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The original consolidated financial statements included herein are in<br />

the Indonesian language<br />

PT CIPUTRA DEVELOPMENT Tbk<br />

DAN ANAK PERUSAHAAN<br />

CATATAN ATAS LAPORAN KEUANGAN<br />

KONSOLIDASI<br />

Tahun yang Berakhir pada Tanggal-tanggal<br />

31 Desember 2010 dan <strong>2009</strong><br />

(Disajikan dalam rupiah, kecuali dinyatakan lain)<br />

PT CIPUTRA DEVELOPMENT Tbk<br />

AND SUBSIDIARIES<br />

NOTES TO THE CONSOLIDATED<br />

FINANCIAL STATEMENTS<br />

Years Ended<br />

December 31, 2010 and <strong>2009</strong><br />

(Expressed in rupiah, unless otherwise stated)<br />

11. HUTANG BANK (lanjutan)<br />

PT Bank Bukopin Tbk<br />

Pada tanggal 21 Juni 2007, CS memperoleh<br />

fasilitas kredit investasi dari PT Bank Bukopin Tbk<br />

dengan pagu pinjaman sebesar Rp20.000.000.000<br />

yang digunakan untuk pembiayaan kembali proyek<br />

<strong>Ciputra</strong> Waterpark. Pinjaman ini akan jatuh tempo<br />

pada tanggal 21 Juni 2011 dan dikenakan tingkat<br />

bunga tahunan sebesar 10,00% pada tahun 2010<br />

dan berkisar antara 10,00% sampai dengan<br />

15,75% pada tahun <strong>2009</strong>. Pembayaran kembali<br />

pokok dan bunga dilakukan secara bulanan mulai<br />

bulan Juli 2007. Pada tahun <strong>2009</strong>, pinjaman ini<br />

dijamin dengan tanah milik CS, dengan biaya<br />

perolehan sebesar Rp22.250.000.000 (Catatan 8).<br />

Pada tanggal 30 September 2010, pinjaman ini<br />

telah dilunasi oleh CS.<br />

PT Bank Central Asia Tbk<br />

Pada tanggal 5 November 2008, ABP, anak<br />

perusahaan CS, memperoleh fasilitas pinjaman dari<br />

PT Bank Central Asia (BCA) Tbk dengan pagu<br />

pinjaman sebesar Rp5.000.000.000 yang terdiri<br />

dari fasilitas cerukan sebesar Rp1.000.000.000 dan<br />

fasilitas kredit investasi sebesar Rp4.000.000.000<br />

yang masing-masing digunakan untuk modal kerja<br />

dan pengembangan infrastruktur pembukaan blok<br />

baru di proyek perumahan Citra Garden Lampung.<br />

Fasilitas cerukan telah jatuh tempo pada tanggal<br />

11 November <strong>2009</strong>. Fasilitas kredit investasi<br />

tersedia sampai dengan tanggal 5 Mei 2011. Kedua<br />

fasilitas kredit tersebut dikenakan tingkat bunga<br />

tahunan sebesar 11,5% per tahun. Untuk pinjaman<br />

yang diperoleh dari fasilitas kredit investasi,<br />

angsuran pokok pinjaman dibayar secara bulanan<br />

dimulai dari Juni <strong>2009</strong>, sedangkan angsuran bunga<br />

dibayar mulai Desember 2008.<br />

Pinjaman tersebut dijamin dengan tanah atas nama<br />

ABP seluas 46.753m2 dan dengan nilai tercatat<br />

sebesar Rp6.250.000.000 (Catatan 6). Biaya<br />

pinjaman atas hutang ini dikapitalisasi ke akun<br />

persediaan tanah kapling (Catatan 6).<br />

Pada tanggal 30 September 2010, pinjaman ini<br />

telah dilunasi oleh ABP.<br />

11. LOANS FROM BANKS (continued)<br />

Bank Bukopin Tbk<br />

On June 21, 2007, CS obtained an investment<br />

credit facility from PT Bank Bukopin Tbk with a<br />

maximum amount of Rp20,000,000,000 which was<br />

used to refinance the <strong>Ciputra</strong> Waterpark Project.<br />

This loan will be due on June 21, 2011. It bore<br />

interest at the annual rate of 10.00% in 2010 and<br />

at annual rates ranging from 10.00% to 15.75% in<br />

<strong>2009</strong>. Both principal and interest of this loan were<br />

paid monthly starting from July 2007. In <strong>2009</strong>, this<br />

loan was collateralized by land owned by CS, with<br />

cost equal to Rp22,250,000,000 (Note 8).<br />

On September 30, 2010, this loan had been fully<br />

paid by CS.<br />

PT Bank Central Asia Tbk<br />

On November 5, 2008, ABP, a subsidiary of CS,<br />

obtained credit facilities from PT Bank Central Asia<br />

Tbk (BCA) totaling Rp5,000,000,000, which consist<br />

of overdraft facility of Rp1,000,000,000 and<br />

investment credit facility of Rp4,000,000,000 used<br />

as working capital and for the development of the<br />

infrastructure of a new block in Citra Garden<br />

Lampung residential project, respectively. The<br />

overdraft facility expired on November 11, <strong>2009</strong>.<br />

The investment loan facility is available until<br />

May 5, 2011. Both loan facilities bear interest at<br />

the annual rate of 11.5%. For the loan drawn from<br />

the investment loan facility, the principal is paid<br />

monthly starting in June <strong>2009</strong>, while the interest is<br />

paid starting in December 2008.<br />

These loans are collateralized by land under the<br />

name of ABP with an area of 46,753sqm and<br />

carrying value of Rp6,250,000,000 (Note 6). The<br />

borrowing cost of this loan was capitalized to land<br />

lots inventory (Note 6).<br />

On September 30, 2010, this loan had been fully<br />

paid by ABP.<br />

63

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!