02.05.2013 Views

User Guide - Mks.com

User Guide - Mks.com

User Guide - Mks.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Graphical<br />

History View<br />

(GUI)<br />

Graphical History View (GUI)<br />

Close a Change Package (see “Closing a Change Package” on<br />

page 235)<br />

Edit an existing Change Package (see “Editing a Change Package” on<br />

page 233)<br />

Discard an existing change package (see “Discarding Change<br />

Packages” on page 236)<br />

Accept casts an accept vote on a change package that is under review<br />

(see “Accepting a Change Package” on page 245<br />

Reject rejects a change package that is under review (see “Rejecting a<br />

Change Package” on page 247).<br />

Create a new Change Package (see “Creating a Change Package” on<br />

page 217)<br />

Source Integrity’s Graphical History view provides a <strong>com</strong>prehensive<br />

picture of the evolution of a project or member from the Project History or<br />

Member History view. The view is designed to clearly display the path of<br />

development from revision to revision, including branches, variants, and<br />

merge lines.<br />

Like the List view, information such as author, state, date, description,<br />

locker, and change package (if one exists) is presented in the Graphical<br />

History view. These details display in a ToolTip when you place the mouse<br />

pointer on a specific revision. Labels appear to the right of the revision,<br />

while icons, like the locked icon, or the working file icon, appear to the left<br />

of the revision.<br />

445

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!