02.05.2013 Views

User Guide - Mks.com

User Guide - Mks.com

User Guide - Mks.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Project History View<br />

For information on toggling between the Graphical History view and the<br />

List view in the Project History view, see “Changing Views (GUI)” on<br />

page 449.<br />

The information in the List view of the Project History view displays in<br />

columns with headings. For information on how to configure the column<br />

set, see “Configuring the Source Integrity Column Set” on page 80.<br />

Depending on your view preferences, your Project History view displays<br />

may be different than the default preferences described here. For more<br />

information on View Preferences, see “View Preferences” on page 61.<br />

The following outlines the default column set and what they display:<br />

Revision is the revision number.<br />

Author is the user who made a checkpoint of the project revision.<br />

Date is the date and time the project revision was checkpointed.<br />

Labels are the labels attached to the revision, for example, Bug Fixes.<br />

State is the revision’s state, for example, Beta.<br />

Select a revision by clicking it or moving the selector bar to it with the<br />

cursor keys.<br />

A box below the list of revisions displays the revision description for the<br />

currently selected revision. As you move the selector bar from one revision<br />

to another, the description changes to reflect the currently selected<br />

revision.<br />

461

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!