04.07.2014 Views

FY 2012 Operating Budget and FY 2013-2017 Financial ... - Septa

FY 2012 Operating Budget and FY 2013-2017 Financial ... - Septa

FY 2012 Operating Budget and FY 2013-2017 Financial ... - Septa

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Capital Improvement Program<br />

System Improvements Program<br />

Information Technology<br />

• Improvements to SEPTA’s communications infrastructure; construction of a backup<br />

network server farm site; replacement of aged desktop systems, network servers <strong>and</strong><br />

peripheral equipment; upgrade <strong>and</strong> purchase of computer software business<br />

applications<br />

• Improvements to system security across computer platforms<br />

• Enhancements to SEPTA’s Internet web site<br />

Radio Narrowb<strong>and</strong>ing/New Radio Frequencies<br />

• Replacement <strong>and</strong> reconfiguration of SEPTA’s existing radio communications system for<br />

all Regional Rail lines. New narrowb<strong>and</strong> will enable SEPTA`s existing radio<br />

communications system to conform with Federal Communications Commission’s (FCC)<br />

guidance<br />

• Rehabilitation/renovation of a radio tower that will enable SEPTA`s existing radio<br />

communications system to establish new radio frequency efficiency st<strong>and</strong>ards<br />

Route 101 & 102 Trolley Line Signals/Interlocking Improvements<br />

• Provide for a new trolley control system including automatic enforcement of safe trolley<br />

separation, <strong>and</strong> overspeed <strong>and</strong> roadway worker protection<br />

• Includes schedule-based control feature for schedule adherence <strong>and</strong> optimum trolley<br />

speed line operation<br />

• Provide automatic speed control for the new rail-highway at-grade crossing systems<br />

Vehicle Overhaul Program<br />

The Vehicle Overhaul Program provides for the major overhaul of SEPTA’s rolling stock.<br />

Vehicles are scheduled for overhauls during their service lives based on vehicle type. A vehicle<br />

must receive periodic overhauls if it is to achieve or exceed its full, useful service life.<br />

Capital Improvement Program Impact on <strong>Operating</strong><br />

Several SEPTA capital improvement projects have a positive impact on the operating budget.<br />

For example, investing in vehicle overhaul programs provides for long-term operating savings<br />

through reduced vehicle in-service failures. This ensures ongoing service quality, reliability <strong>and</strong><br />

performance <strong>and</strong> reduces the need for ongoing repairs of vehicles with failures. Investment in<br />

new bus vehicles has a positive impact on the operating budget <strong>and</strong> the environment through<br />

reduced fuel consumption <strong>and</strong> reduced emissions.<br />

Projects which renovate, reconstruct, or replace existing facilities, stations <strong>and</strong> equipment often<br />

do not materially change the cost of operation over the life of the asset, if the replacement is<br />

functionally equivalent to its predecessor. These projects, when completed, generally require<br />

similar operating <strong>and</strong> maintenance costs.<br />

SEPTA Fiscal Year <strong>2012</strong> <strong>Operating</strong> <strong>Budget</strong> 163

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!