3.1.3 Fabrication<br />

Fabrication requirements vary as a function <strong>of</strong> the selected structural system type and glass<br />

system type. Depending upon the glass specification, product cost and availability, the glass<br />

may be imported, which can present logistical and scheduling issues. These requirements<br />

are not trivial, and how they are dealt with will directly impact the quality, timely completion<br />

and cost <strong>of</strong> the work. Exposed steel structures require a level <strong>of</strong> craftsmanship in their<br />

fabrication that is uncommon in the construction marketplace. Measures must be taken both<br />

in properly specifying the work requirements on the design side and assuring that these<br />

specifications are in fact met on the build side. Again, some <strong>of</strong> the materials and processes<br />

utilized in structural glass facades, while not new by any means are unfamiliar to much <strong>of</strong> the<br />

construction industry, impacting fabrication and erection processes as much as they do<br />

design practices.<br />

On approval <strong>of</strong> final design by the architect, and <strong>of</strong>ten before, the design/build contractor will<br />

commence the fabrication scope <strong>of</strong> work, including material procurement and subcontracting<br />

to other service providers as required. The design/builder may or may not have its own<br />

fabrication facilities. The project specifications may stipulate that certain materials or<br />

services be acquired from a named provider (sole-source) or providers. Such specifications<br />

<strong>of</strong>ten include an “or equal” clause, that allows the design/builder to submit an alternate<br />

provider for approval by the architect.<br />

Fabrication issues are discussed in more detail in Chapter 2.<br />

3.1.4 Erection<br />

The building site is where all prior work converges for assembly and erection; construction<br />

can be the most challenging and demanding phase <strong>of</strong> a project. The financial success <strong>of</strong> a<br />

project is most <strong>of</strong>ten determined on the building site, at least in areas with high field labor<br />

rates. Here again the previously cited elements that comprise structural glass technology<br />

136