03.01.2015 Views

STRUCTURAL GLASS FACADES - USC School of Architecture

STRUCTURAL GLASS FACADES - USC School of Architecture

STRUCTURAL GLASS FACADES - USC School of Architecture

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The budget can be developed along with the design, and accommodations and<br />

adjustments made as appropriate, acting as a kind <strong>of</strong> value-engineering built in to the<br />

process.<br />

<br />

Provides single-source responsibility to the owner or general contractor, simplifying<br />

management and mitigating risk.<br />

<br />

Minimizes the design scope for the architect by allowing most <strong>of</strong> the design development<br />

and final detailing and engineering to be passed on to a specialty subcontractor.<br />

<br />

The potential for schedule compression can result in major savings over the<br />

design/bid/build method.<br />

3.2.2.2 Weaknesses <strong>of</strong> Design/Build<br />

<br />

The architect can easily lose control over the design, resulting in compromises to the<br />

design and the quality <strong>of</strong> the finished work.<br />

<br />

Involving the façade contractor into the design process can present a conflict <strong>of</strong> interest,<br />

rather like asking the fox to guard the hen house. An disreputable subcontractor can<br />

sacrifice the quality <strong>of</strong> the design and completed work to their own gain, again placing<br />

the burden and challenge <strong>of</strong> identifying a qualified and reputable entity very early in the<br />

process on the owner or general contractor.<br />

<br />

Budgets and costs can drift and the development <strong>of</strong> the budget must be carefully<br />

managed to assure maximum value to the owner.<br />

<br />

Success relies heavily on the owner or general contractor’s ability to qualify and select a<br />

competent, appropriate and reputable subcontractor.<br />

142

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!