10.07.2015 Views

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Chapter 5 – Team Organisation5.3 <strong>HFI</strong> Activities5.3.1 Concept Phase Activities5.3.1.1 Outline Future OrganisationPurposeTo provide an early view of the organisation of teams thatoperate, maintain and are supported by the Equipment.Inputs • Schemes of Complement for existing vessels usingcomparable equipments (Chap 6).• High-level allocation of functions in equipment options(Chap 15).Methods • <strong>Human</strong> <strong>Factors</strong> Trade-Off Analysis• Team DesignSteps • An outline future organisation is required to support eachequipment option and to form an input to each outlinemanningestimate (Chap 4).• User and maintainer roles are identified from a high-levelallocation of functions between equipment and personnel(Chap 15).• Team roles and structures are outlined using Team Designbased on equipment functions and human-human interfacerequirements.• <strong>Human</strong> <strong>Factors</strong> Trade-offs are performed between teamoptions and implications for WLC in terms of training andUPC in terms of workspace and equipment requirements.Outputs • A high-level representation of the future organisation of theteams manning each equipment option.• The information about the future organisation is used todevelop the Project Specific Target Audience Description(PSTAD) (see Chap 6) for the personnel associated with theequipment.<strong>HFI</strong> ActivitiesNov 2006 Page 5-15 Issue 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!