10.07.2015 Views

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>MAP</strong>-<strong>01</strong>-<strong>01</strong>1 – <strong>HFI</strong> <strong>Technical</strong> <strong>Guide</strong> (STGP 11)4.3.2 Assessment Phase Activities4.3.2.1 Produce Draft Basic Manning RequirementPurposeInputsMethodsTo provide a formal record of the vessel’s manning requirement.It is used as the basis for deriving the Draft AccommodationStatement and for refined costing of the manpower element ofthe Ship’s WLC.A Draft BMR is developed for each selected Outline BMR optionand follows the same general procedure.Uses the same HF methods as Produce Outline Basic ManningRequirement (4.3.1.3), with the following additional steps.Steps • Review refined user requirements to identify changesthrough the early stages of procurement.• Review details of equipment fits to identify changes inmaintenance loading assumptions.• Take note of manning requirements and task descriptionsfrom task and workload analyses for operational spaces(e.g., Bridge, Ops Room, Ship Control Centre (SCC) andManoeuvring Room, Aviation spaces, Upper Deck), RAS andstoring, and Ship Husbandry.• Input the manning requirements and task descriptionsemerging from the component system areas such asCombat System and marine engineering equipments. Liaiseclosely with related equipment and support projects to collatemanning estimates.• Ensure that the draft BMR is disseminated to equipment andsupport projects to impose an overall constraint on theirmanning levels.• Agree manning levels (including male/female numbers) andfull complement with FLEET NPS.<strong>HFI</strong> ActivitiesOutput • The Draft BMR consists of the following:o Draft numbers of officers by rank and branch.o Draft numbers of Senior Ratings by rate and branch.o Draft numbers of Junior Ratings by rate and branch.o Draft watchkeeping, primary and secondary taskdescriptions and skill requirements.The Draft BMR and supporting data contributes to thecomplement requirements section of the URD / SRD.The information in the Draft BMR is to be maintained in thePSTAD for the platform.Nov 2006 Page 4-22 Issue 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!