10.07.2015 Views

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>MAP</strong>-<strong>01</strong>-<strong>01</strong>1 – <strong>HFI</strong> <strong>Technical</strong> <strong>Guide</strong> (STGP 11)16.2.1 <strong>HFI</strong> Focus ResponsibilitiesThe <strong>HFI</strong> Focus is responsible for the following:• Co-ordination of <strong>HFI</strong> maintenance and ship husbandry activities with theIntegrated Logistics Support (ILS) programme and the Logistics SupportAnalysis (LSA).• Liaison with System Project Managers to ensure that maintenancemanning estimates, equipment fit and workspace aspects of equipmentproject <strong>HFI</strong> and ILS programmes (Chap 14) are co-ordinated with those ofthe platform.• Liaison with stakeholders, especially the Integrated Logistics SupportManager (ILSM), to ensure that maintenance and ship husbandry policyreflects best practice in the RN.• Identification and development of <strong>Human</strong> <strong>Factors</strong> Style <strong>Guide</strong>s (Annex 3)to promote maintenance commonality across the platform (Chap 15).<strong>HFI</strong> Process• Identification and control of ship husbandry workload drivers in the platformdesign.• Co-ordination of maintenance workspace requirements within the GeneralArrangement (Chap 8).• The development and application of assessment and acceptance methodsto test <strong>HFI</strong> aspects of maintenance in conjunction with the ILS Plan (ILSP).• Liaison with DEC, MLS CG and IPT System Support Managers to agreethe maintenance duties for personnel manning the equipment.• Liaison with FLEET-NPS to ensure that the maintenance manningassumptions are appropriate given the RN Manpower Policy and complywith the assumptions made in the complementing process (Chap 4).• Liaison with FOTR to identify the training implications of new maintenanceskills and knowledge requirements and new job descriptions (Chap 7).• Liaison with ILSM to co-ordinate the <strong>HFI</strong> aspects of maintenance and toensure that results are compatible with the ILS concept for the equipment.16.2.2 Relevant StandardsThe applicable standards are listed in Table 16-2 below. Further details on thesestandards are included in Annex 2, together with other related standards.StandardDef Stan 00-25 Part 15Def Stan 00-25 Part 19Title<strong>Human</strong> <strong>Factors</strong> for Designers of Systems.Part 15: Principles and Process<strong>Human</strong> <strong>Factors</strong> for Designers of Systems.Part 19: <strong>Human</strong> Engineering Domain – <strong>Technical</strong>Guidance and DataNov 2006 Page 16-12 Issue 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!