10.07.2015 Views

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Chapter 9 – Operational Spaces• Check manning levels against BMR for consistency withcomplement constraints and non-encroachment on margins(Chap 4).• Identify the <strong>HFI</strong> adjacency requirements of compartmentswith other functionally related spaces using Link Analysis.• Correlate the spatial and location requirements in accordancewith the <strong>HFI</strong> policy in establishing General Arrangement totake account of the results of Health & Safety Analysis(Chap 17).• Establish inter-compartment and traffic flow requirements(Chap 12).• The collated workspace data is reviewed for traceability fromthe platform requirements.The Upper Deck <strong>HFI</strong> requirements are outlined in the followingway:• Identify the Upper Deck evolutions to be undertaken.• Conduct high-level Task Synthesis reflecting the evolutionrequirements. Utilise and correlate these with the results ofrelevant Task Synthesis undertaken for aviationarrangements.• Review and collate the traffic flow and access requirements(Chap 12) related to the various evolutions using LinkAnalysis and Escape Analysis.• Use ship motion analysis (Chap 13) to establish spatialoperating envelopes for each evolution task set. Overlaythese with traffic flow routing paths to avoid mutualencroachment on space.• Generate outline functional layout diagrams. Identify anyoutline requirements for mock-ups or Synthetic UserModelling to clarify critical spatial arrangements. Takeaccount of Health & Safety Analysis (Chap 17) of the upperdecks.The procedure for producing the outline workspace requirementis as follows:• Liaise with System Project Managers to identify thefunctionality, manning and maintenance task requirements forthe electrical and machinery spaces referring to RoleDefinition and the TAD (Chap 4, Chap 5, Chap 6, Chap 15,Chap 16).• Identify any local control or workstation design requirements(Chap 14) in the electrical and machinery spaces that are theremit of the <strong>HFI</strong> Focus; refer to the TAD.• Liaise with relevant stakeholders to identify the functionality,manning and tasking requirements of offices. Conduct highlevelTask Synthesis as necessary.<strong>HFI</strong> ActivitiesNov 2006 Page 9-11 Issue 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!