10.07.2015 Views

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>MAP</strong>-<strong>01</strong>-<strong>01</strong>1 – <strong>HFI</strong> <strong>Technical</strong> <strong>Guide</strong> (STGP 11)8.3 <strong>HFI</strong> Activities8.3.1 Concept Phase Activities8.3.1.1 Develop High-Level General Arrangement OptionsPurposeTo enable different layouts for the General Arrangement to bedeveloped, thus permitting their subsequent evaluation andselection.Inputs • Vessel concept studies• Preliminary general dimensions of hull designMethods • Operational Scenario Description• Target Audience Description• Link AnalysisSteps • Collate information about general platform functions andexisting requirements affecting layout.• Identify new requirements or novel concepts affectinginternal layout.• Develop outline drawings of internal layout.• Identify criteria for assessing layouts including adjacencyrequirements, compartment and deck suitability forevolutions, minimisation of traffic route length, habitability,health and safety, survivability, damage control, and aircraftand equipment handling and movement.• Conduct high-level assessments of compartment locationsand general dimensions, upper deck layout and traffic routesagainst criteria.OutputHigh-level options for General Arrangement of platform.<strong>HFI</strong> ActivitiesNov 2006 Page 8-10 Issue 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!