10.07.2015 Views

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Chapter 15 – Operability And User-Equipment Interaction15.3.5 In Service Phase Activities15.3.5.1 Continue Manufacture Phase AssessmentsIn-Service phase support is based upon continuing the activities underManufacture Phase (Sect 15.3.4), with an emphasis on outputting requirementsas a result of these activities, which can then be used to instigate the followingactivity (Sect 15.3.5.2).15.3.5.2 Support ModificationsPurposeTo provide effective reassessment and specification ofoperability and user-equipment interfaces, resulting frommodification to the overall requirement during the operationallife.Inputs • Operability and User Interface Specifications and Designs• Revised requirement (e.g. system design, functional)MethodsAs per Demonstration Phase.Steps • Develop interface HF requirements resulting from the revisedoverall requirement that is driving the modification• Modify interface specification and design in accordance withthe requirements identified above (Sect 15.3.5.1).OutputsRevised interface specifications.<strong>HFI</strong> ActivitiesNov 2006 Page 15-37 Issue 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!