10.07.2015 Views

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Chapter 15 – Operability And User-Equipment Interaction15.3.1.2 Outline User TasksPurposeTo provide an initial description of the user tasks likely to besignificant in the equipment.Inputs • Product from outline use of automation (Sect 15.3.1.1).• Project Specific Target Audience Description (PSTAD)(Chap 6)Methods • Mission Analysis.• System Requirements.• Operational Scenario Description.• Allocation of Functions (Partitioning).• Task Synthesis.• Task Analysis.Steps • Identify the user and maintainer roles for the equipment fromcurrent manning practice (Chap 5), the Integrated LogisticsSupport (ILS) concept (Chap 16) and from the emergingconcept of operation for the new equipment (MissionAnalysis and System Requirements, Allocation of Function).• Identify user tasks that will be critical to the achievement ofoperational performance given the projected use ofautomation (Task Synthesis).• Develop initial task descriptions taking account of futureOperational Scenarios.OutputsOutline user and maintainer task descriptions for eachanticipated user role including the goal, high-level procedure andoutput of each significant task.<strong>HFI</strong> ActivitiesNov 2006 Page 15-19 Issue 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!