10.07.2015 Views

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>MAP</strong>-<strong>01</strong>-<strong>01</strong>1 – <strong>HFI</strong> <strong>Technical</strong> <strong>Guide</strong> (STGP 11)14.3.4 In-Service Phase Activities14.3.4.1 Support ModificationsPurposeInputsMethodsStepsOutputsTo provide effective reassessment and specification ofequipment layout, resulting from modification to the requirementduring the operational life.As per previous phasesAs per previous phases.As per previous phases, but tailored to the scope of thechanges.Revised specifications and design for equipment layout.14.3.4.2 Provide Proactive SupportPurposeInputsMethodsTo proactively intervene as appropriate to ensure that WLCs areminimised and performance maximised.Operational data: user feedback, incident reportsAs per previous phases.Steps • As per previous phases• Instigate fuller modification activity under Sect 14.3.4.1 ifnecessary.Outputs • Revised specifications and design.• Recommendations and lessons learned for future projects.<strong>HFI</strong> Activities14.3.5 Disposal Phase ActivitiesNone identified.Nov 2006 Page 14-20 Issue 4<strong>MAP</strong>-<strong>01</strong>-<strong>01</strong>1 CH 14_16.doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!