10.07.2015 Views

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Chapter 4 – Manpower, Complementing and Accommodation4.1 <strong>HFI</strong> <strong>Technical</strong> Issues4.1.1 OverviewComplementing is the process of developing and assuring a viable, sustainableand effective manpower organisation that is optimised to support and meet theneeds of both a specific capability and the whole Navy as expressed throughindividuals, teams and communities, as well as systems, platforms and theService. 1A sufficient amount of accommodation at an acceptable level of habitability is tobe provided for the Complement and in order to meet other operational andorganisational demands throughout the life of the platform.<strong>HFI</strong> <strong>Technical</strong> IssuesFundamentally, manpower is the response to a requirement to perform (a rangeof) tasks that taken together comprise the Concept of Operations specified for asystem.Manning refers to the manpower requirements for compartments or to operateequipment; complementing refers to the total requirement at the level of thewhole ship.The basic working document employed by FLEET NPS when designing aScheme of Complement (SoC) for a new platform, is the Quarter Bill (QB).Supporting information is contained in the Basic Manning Requirement (BMR),which is effectively a draft QB. In early stages of platform design, when anumber of platform and fit options exist, a corresponding number of versions ofthe BMR can exist. These versions represent the basis on which manpowercosts are calculated for inclusion in the whole-life costs (WLC) estimates and bywhich the platform options are compared.The <strong>Human</strong> <strong>Factors</strong> <strong>Integration</strong> (<strong>HFI</strong>) Focus is responsible for providingestimates of the manpower required to operate and maintain the equipment tothe IPT leader as part of the above process.4.1.2 StakeholdersA list of potential stakeholders for this area is given below. This list is notexhaustive and should be seen to be a guide only. <strong>HFI</strong> Foci should refine this listbased upon the structure of their project, the attendees at the relevant HFSG orHFWG and in light of guidance and requests from industry, DEC and Customer 2representatives.• FLEET NPS BS• FLEET-NLM• DEC• FOTR• INM• IPT <strong>HFI</strong> Foci• MLS IPT CG• SSG-ShipDes1 See ‘Complementing Method and Tool Support Strategy Study - Final Report’ [Ref 16].Nov 2006 Page 4-3 Issue 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!